The Ege Biogas Project (VCS-3651) is a VCS-registered biogas project in Turkey with a VVB-confirmed barrier additionality test and no material findings, but it is undermined by a six-fold discrepancy in claimed ERR between two PDD versions, a 0% leakage deduction that the validation report describes as 'not addressed,' and a low-confidence extraction across eight documents. The project's energy-substitution nature limits permanence risk, yet the absence of a stated buffer pool, a project-specific modeled baseline, and unresolved documentation contradictions leave meaningful uncertainty about the robustness of the credit claims.

Red Flags

  • The 2022 PDD claims a total ERR of 370,363 tCO₂e while the 2024 PDD claims only 56,895 tCO₂e — a 6.5-fold discrepancy that is not explained in the extracted record and raises serious data-reliability concerns.
  • The validation report (Oct 2024) records the leakage justification as 'not addressed' while the PDD (Sep 2024) states 'deemed negligible'; a 0% leakage deduction without a clear, consistent justification is a gap for a biogas project where fugitive methane emissions are a known risk.
  • Minimum extraction confidence is rated 'low,' indicating at least one key document was poorly readable, which weakens confidence in the accuracy of all extracted facts.
  • FPIC status is contradictory: the validation report (Oct 2024) confirms FPIC was conducted, while the PDD (Sep 2024) records it as not conducted.

Credit Vintages

IssuedRetiredAvailable
2021
17,909017,909
2022
32,091032,091
Total50,000050,000

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Buffer pool not stated; low inherent risk (energy substituti

Leakage

0% deduction; justification 'not addressed' in validation re

Baseline

Project-specific, modeled; reassessment timing not stated

Safeguards

FPIC contradictory; grievance mechanism present

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AM0073

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents