Bekmezci Biogas Energy Power Plant
#78of 111 in Biogas#116of 121 in Turkey#541of 629 in Verra (VCS)#10of 11 in AM0073
Audit Analysis
The Bekmezci Biogas project is a VCS-registered biogas-to-energy project in Turkey with a confirmed investment additionality test, but the validation report identified six material findings including formula errors in ex-ante emission reduction calculations and non-compliant monitoring and leakage plans. No monitoring data or verified emission reductions are available despite the project being four years into its seven-year crediting period, and the final validation report indicates the absence of FPIC, a grievance mechanism, and documented safeguards. The project carries moderate over-crediting risk and limited transparency.
Red Flags
- Six material findings at validation, including non-reproducible ex-ante emission reduction calculations with formula errors and a monitoring plan that did not meet methodology requirements
- No verified emission reductions or monitoring data available despite the project being four years into its 2021–2028 crediting period
- Final validation report (July 2025) confirms absence of FPIC, grievance mechanism, and documented safeguards, contradicting the earlier June 2025 validation report
- No buffer pool or permanence mechanism identified in available documents
- Low extraction confidence across the document set, indicating readability or quality issues in source documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but analysis had gaps
No buffer pool or permanence mechanism stated
Quantified but deduction pct unstated; initial calc non-comp
Project-specific, modeled; no reassessment data
No FPIC, grievance mechanism, or safeguards per final report
CORSIA false; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →