Skip to main content
CDMWindIndiaGeneral Methodologyv2.0

4.5 MW Wind Power Project in Kadavakallu, Andhra Pradesh

CDM-1131 ↗

#117of 770 in Renewable energy#63of 387 in India#15of 213 in CDM (UNFCCC)

6.1/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A 4.5 MW wind displacement project under CDM AMS 1.D with VVB-confirmed additionality and appropriate leakage treatment, but hampered by a baseline-method contradiction between the validation and monitoring reports, a grid emission factor drawn from 2005, and four material findings (all resolved). The project delivered roughly 115% of its pro-rata ex-ante expectation in the first monitoring period, indicating no over-crediting risk.

Red Flags

  • Baseline method is described as 'project' in the monitoring report but 'jurisdictional' in the validation report — a direct contradiction that undermines confidence in the baseline characterization
  • Grid emission factor of 0.86 tCO2/MWh is drawn from 2005 data; no evidence of periodic grid-EF updates across the 10-year crediting period
  • Four material findings were raised during verification, including an inconsistency in the source of generation data between PDD sections and an inappropriate meter reading for ER calculation

Credit Vintages

IssuedRetiredAvailable
2013
14,247014,247
Total14,247014,247

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% justified for grid-displacement wind

Baseline

Method contradiction; 2005 grid EF

Safeguards

Mentioned but details not extracted

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents