49.5 MW Wind Power Project by Master Wind Energy Limited in Pakistan
#102of 1935 in Renewable energy#1of 9 in Pakistan#36of 1339 in Verra (VCS)#70of 1287 in ACM0002
Audit Analysis
A 49.5 MW grid-connected wind project in Pakistan with a solid jurisdictional baseline (grid emission factor of 0.6943 tCO₂/kWh) and a VVB-confirmed investment additionality test. The main weaknesses are the absence of a stated buffer pool, unaddressed reversal/permanence risk, and several minor MRV inconsistencies flagged as material findings. Overall a credible renewable-energy credit with moderate documentation quality.
Red Flags
- Reversal events are explicitly noted as 'not addressed' and no non-performance risk rating was determined by the project proponent.
- Four material findings in the verification report include a 13-month calibration delay on three meters and two energy-export/import value inconsistencies between the ER sheet and the JMR.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 8,556 | 8,556 | 0 | |
| 2017 | 84,899 | 84,899 | 0 | |
| 2018 | 96,412 | 96,412 | 0 | |
| 2019 | 81,341 | 81,341 | 0 | |
| 2020 | 65,147 | 65,147 | 0 | |
| 2021 | 81,427 | 81,427 | 0 | |
| Total | 417,782 | 417,782 | 0 |
Risk Indicators
Investment test, VVB-confirmed
reversal not addressed
0% deemed negligible, consistent with grid-connected wind
Jurisdictional grid EF (0.6943), ACM0002-appropriate
Grievance mechanism present; FPIC not stated; VVB requested more detail
CORSIA and CCP statuses not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →