4B EREGLI LFG POWER PLANT
#75of 121 in Turkey#330of 632 in Verra (VCS)#20of 53 in ACM0001
Audit Analysis
The 4B Ereğli LFG-to-Power project in Turkey is a registered VCS project with VVB-confirmed additionality and no reversal events, but it carries a heavy burden of material findings (seven) and corrective actions (ten), including calibration lapses and a 62% shortfall in monitored waste versus ex-ante estimates. The verified emission reductions for the monitoring period match the claimed figure, so there is no over-crediting for the elapsed period, yet the project delivered only about 36% of the pro-rata lifetime expectation, raising questions about baseline optimism. Multiple cross-document contradictions and several unaddressed fields (CORSIA, CCP, benefit sharing) limit confidence in the overall record.
Red Flags
- Monitored waste amounts were 62% lower than ex-ante estimates, suggesting the PDD baseline may have been overly optimistic
- Gas analyser calibration was not performed every 6 months as required by the registered project design, and the VVB applied a conservative adjustment rather than rejecting the data
- Ten corrective actions were required by the VVB, including missing meter calibration documents, incorrect ER calculations, and missing process diagrams
- No buffer pool percentage is stated in the extracted record, leaving permanence risk unquantified
- Benefit sharing is described in the PDD but the verification report states it is not described, creating a documentation gap on stakeholder engagement
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
No reversal events but buffer pool not stated
Quantified at 0% with justification
Project-specific modeled baseline; 62% waste shortfall
FPIC and grievance mechanism present; benefit sharing incons
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →