4MW Biomass Power Plants Using Waste Wood Chips & Sawdust in Central Java Province, Indonesia
#38of 196 in Biomass#5of 17 in Indonesia#61of 213 in CDM (UNFCCC)
Audit Analysis
A CDM biomass energy project in Central Java with VVB-confirmed additionality and no reversal events, but significant data gaps in leakage quantification, FNRB, and permanence mechanisms. The ERR figures in the validation and monitoring reports differ substantially, and a material finding on biomass input monitoring required a corrective action. Overall a moderately robust project with notable documentation and transparency weaknesses.
Red Flags
- ERR discrepancy: validation report (2008) estimates 14,602 tCO2e over the full 7-year crediting period, while the monitoring report (2010) reports 11,147 tCO2e for a 6-month period — roughly 10.7× the pro-rata expectation, raising questions about data consistency or reporting basis
- Leakage is described as 'quantified' in the monitoring report but no specific deduction percentage or methodology is stated in any available document
- No buffer pool or permanence mechanism is documented for this project
- A material finding in the monitoring report required corrective action to monitor biomass input in accordance with AMS-I.A. paragraph 16
- FNRB value and calculation method are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 10,982 | 0 | 10,982 | |
| Total | 10,982 | 0 | 10,982 |
Risk Indicators
VVB-confirmed combined test
Avoidance type, no reversals, but no buffer pool documented
Described as quantified but no specific value stated
Project-specific baseline, no reassessment date found
Safeguards mentioned but FPIC and grievance mechanism not de
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →