Skip to main content
CDMEE own generationIndiaACM0004

4MW Waste Heat Recovery based power project by GRSPL, India

CDM-1114 ↗

#65of 202 in Industrial#184of 387 in India#73of 213 in CDM (UNFCCC)#6of 17 in ACM0004

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
6.5

Audit Analysis

A 4 MW waste-heat-recovery power project under CDM with VVB-confirmed additionality and resolved material findings, but undermined by contradictory ERR figures across monitoring reports, an inconsistent baseline-method description, and a 0% leakage deduction supported only by a 'deemed negligible' label. The project is a 2007-era CDM registration with limited modern MRV transparency.

Red Flags

  • ERR figures are contradictory: the 2010 monitoring report reports 33,677 tCO₂e while the 2011 monitoring report reports 21,054 tCO₂e, and the shorter-period figure is higher, raising data-reliability concerns
  • Baseline method is described as 'project' in the 2011 monitoring report but 'jurisdictional' in the 2007 PDD, creating ambiguity about the actual baseline construction
  • Crediting-period start date appears as April 2007 (original), July 2007 (validation report and material-finding revision), and October 2007 (2011 monitoring report) across documents
  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis

Credit Vintages

IssuedRetiredAvailable
2011
33,481033,481
2012
21,052021,052
Total54,533054,533

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

EE project, no biogenic reversal risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Method contradicts across documents

Safeguards

Mentioned but details not found

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0004

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.