A 4 MW waste-heat-recovery power project under CDM with VVB-confirmed additionality and resolved material findings, but undermined by contradictory ERR figures across monitoring reports, an inconsistent baseline-method description, and a 0% leakage deduction supported only by a 'deemed negligible' label. The project is a 2007-era CDM registration with limited modern MRV transparency.
Red Flags
- ERR figures are contradictory: the 2010 monitoring report reports 33,677 tCO₂e while the 2011 monitoring report reports 21,054 tCO₂e, and the shorter-period figure is higher, raising data-reliability concerns
- Baseline method is described as 'project' in the 2011 monitoring report but 'jurisdictional' in the 2007 PDD, creating ambiguity about the actual baseline construction
- Crediting-period start date appears as April 2007 (original), July 2007 (validation report and material-finding revision), and October 2007 (2011 monitoring report) across documents
- Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 33,481 | 0 | 33,481 | |
| 2012 | 21,052 | 0 | 21,052 | |
| Total | 54,533 | 0 | 54,533 |
Risk Indicators
VVB-confirmed combined test
EE project, no biogenic reversal risk
0% deduction, 'deemed negligible' only
Method contradicts across documents
Mentioned but details not found
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →