5.7 MW Rice Husk based Cogeneration Project at Kanpur Dehat, Uttar Pradesh
#187of 196 in Biomass#406of 421 in Universal Carbon Registry (UCR)#40of 42 in AMS-I.C
Audit Analysis
This 5.7 MW rice husk cogeneration project under the UCR registry has only a Project Design Document in the available record, with no verification reports, monitoring reports, or VVB documentation. Critical integrity elements — additionality testing, baseline reassessment, buffer pool, and verified emission reductions — are absent from the extracted data, making it impossible to confirm the project's climate claims. The project is not yet due for baseline reassessment under standard rules, but the overall evidentiary base is too thin to support a confident quality assessment.
Red Flags
- No verification report, monitoring report, or VVB report found in the available record — only a single PDD (dated 2022-06-01) is present
- Additionality test type and VVB confirmation are not stated in any available document
- No total emission reduction figures (claimed or verified) are available, preventing any over- or under-crediting assessment
- No grid emission factor or fnrb value is recorded, leaving the baseline calculation unverifiable
- Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool stated; no reversal data
0% deduction, 'deemed negligible' only
Project-specific baseline, no reassessment date
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →