Biomass based thermal energy generation project by M/S Ginni International Ltd
#189of 196 in Biomass#410of 421 in Universal Carbon Registry (UCR)#42of 42 in AMS-I.C
Audit Analysis
This biomass thermal energy project under the UCR registry presents a significant evidence gap: only a Project Design Document is available, with no verification report, monitoring report, or VVB identification. The claimed 32,142 tCO₂e over a 9-year crediting period remains entirely unverified, and key integrity elements such as additionality testing, baseline reassessment, and leakage quantification are absent from the record.
Red Flags
- No verification report or monitoring report found in the extracted record — the 32,142 tCO₂e claim is entirely unverified
- No VVB identified and no additionality test type or VVB confirmation found in the PDD
- Leakage deduction of 0% justified only as 'deemed negligible' without quantification, for a biomass fuel project where fuel-switching leakage is plausible
- Project-specific baseline with no reassessment date recorded, limiting confidence in the counterfactual
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool; reversal risk unassessed
0% deduction, 'deemed negligible' without quantification
Project-specific, no reassessment date recorded
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →