4.4 MW Rice Husk based Cogeneration Project at Sangat Kalan, Punjab
#185of 196 in Biomass#393of 421 in Universal Carbon Registry (UCR)#39of 42 in AMS-I.C
Audit Analysis
This 4.4 MW rice husk cogeneration project under the UCR registry relies on a single PDD document with no verification report, monitoring report, or VVB assessment available. Critical elements including additionality testing, verified emissions reductions, grid emission factors, and buffer pool arrangements are absent from the extracted record, leaving the project's integrity and claim safety largely unverified.
Red Flags
- No additionality test type or VVB verification of additionality found in any available document
- No verified ERR figure exists — only the ex-ante claim of 100,086 tCO₂e is documented
- No buffer pool or permanence mechanism identified for a biomass project with residual reversal risk
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantitative analysis
- Only one document (PDD) available; no verification report, monitoring report, or VVB report in the record
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool; no reversal events but no data to confirm
0% deduction, 'deemed negligible' without quantitative suppo
Project-specific baseline; no reassessment date documented
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →