Skip to main content
UCRVillage Sangat Kalan Dabwali Road Bathinda 151001 Punjab IndiaAMS-I.C

4.4 MW Rice Husk based Cogeneration Project at Sangat Kalan, Punjab

UCR-188 ↗

#185of 196 in Biomass#393of 421 in Universal Carbon Registry (UCR)#39of 42 in AMS-I.C

2.6/ 10
Integrity
3.5
Transparency
1.0
Claim Safety
3.0
Documentation
2.5

Audit Analysis

This 4.4 MW rice husk cogeneration project under the UCR registry relies on a single PDD document with no verification report, monitoring report, or VVB assessment available. Critical elements including additionality testing, verified emissions reductions, grid emission factors, and buffer pool arrangements are absent from the extracted record, leaving the project's integrity and claim safety largely unverified.

Red Flags

  • No additionality test type or VVB verification of additionality found in any available document
  • No verified ERR figure exists — only the ex-ante claim of 100,086 tCO₂e is documented
  • No buffer pool or permanence mechanism identified for a biomass project with residual reversal risk
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantitative analysis
  • Only one document (PDD) available; no verification report, monitoring report, or VVB report in the record

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB confirmation found

Permanence

No buffer pool; no reversal events but no data to confirm

Leakage

0% deduction, 'deemed negligible' without quantitative suppo

Baseline

Project-specific baseline; no reassessment date documented

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not docum

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.C.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents