Skip to main content
UCRTamil NaduGeneral Methodologyv2.0

3 MW Biomass-fired cogeneration project at Tamil Nadu

UCR-388 ↗

#183of 196 in Biomass#6of 7 in Tamil Nadu#391of 421 in Universal Carbon Registry (UCR)

2.6/ 10
Integrity
3.0
Transparency
1.0
Claim Safety
4.0
Documentation
2.0

Audit Analysis

This 3 MW biomass cogeneration project in Tamil Nadu is registered under the UCR registry using the AMS-I.C. methodology, but the available evidence is extremely limited to a single PDD dated after the crediting period ended. No additionality assessment, verification report, monitoring data, or VVB identification could be found, leaving the core integrity claims largely unverified. The 0% leakage deduction rests on a bare 'deemed negligible' justification without quantitative support.

Red Flags

  • No additionality test or VVB verification of additionality found in any available document
  • PDD is dated 19 October 2023, after the crediting period ended on 31 December 2022, raising questions about the document's provenance and whether it reflects the original project design
  • No verification report, monitoring report, or VVB report is available — the entire 75,744 tCO₂e claim is unverified
  • No VVB (verification body) is identified in the extracted record
  • 0% leakage deduction justified only as 'deemed negligible' with no quantitative analysis for a biomass supply-chain project

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test documented

Permanence

No buffer pool; no reversal data

Leakage

0% deduction, minimal justification

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.