Audit Analysis
This 2.05 MW renewable energy project in Tamil Nadu relies on a single PDD document with no verification report, monitoring report, or VVB identification available. While no material findings or corrective actions are reported and the methodology (AMS-I.C v22) is recognized, critical elements such as additionality verification, baseline reassessment, and verified emission reductions are entirely absent from the extracted record, making independent quality assessment very difficult.
Red Flags
- No verification report or VVB identification found in the available record; additionality test type and VVB confirmation are not stated
- No monitoring report or verified ERR figure available; the 61,152 claimed ERRs cannot be independently validated
- Only a single PDD document is available; no grid emission factor, usage monitoring method, or baseline reassessment date is recorded
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found
No buffer pool stated; low inherent risk for RE project
Quantified at 0% with stated justification
Project-specific baseline; no reassessment date
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →