Biomass based power project by Shri Shyam Warehousing and Power Pvt. Ltd, Banari, Chhattisgarh
#188of 196 in Biomass#409of 421 in Universal Carbon Registry (UCR)#41of 42 in AMS-I.C
Audit Analysis
This biomass power project under the UCR registry has a jurisdictional baseline and a recognised small-scale methodology, but the available documentation is limited to a single PDD with no verification report, monitoring report, or VVB assessment. Additionality, permanence safeguards, and verified emissions reductions are entirely unconfirmed, and the PDD is dated after the crediting period ended, raising questions about the project's registration timeline.
Red Flags
- No VVB or verification report found in the extracted record; additionality, monitoring, and verification are entirely unconfirmed
- PDD dated 17 July 2023, which is after the crediting period end of 31 December 2022, suggesting possible retroactive registration or a documentation sequencing issue
- No verified ERR figure available; the claimed 237,636 tCO2e cannot be independently corroborated
- No buffer pool or permanence safeguard documented for a project whose credits depend on continued operation
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found
No buffer pool; reversal risk unaddressed
0% deduction, 'deemed negligible' only
Jurisdictional but 2013 grid EF, no reassessment date
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →