16 TPH Biomass Boiler Project by Om Shree Agro Tech Private Limited in Maharashtra, India
#171of 196 in Biomass#9of 13 in Maharashtra India#301of 421 in Universal Carbon Registry (UCR)#35of 42 in AMS-I.C
Audit Analysis
This 16 TPH biomass boiler fuel-switch project under the UCR registry presents a plausible emissions-reduction claim of 34,702 tCO₂e over a 10-year crediting period, but the evidentiary base is extremely thin: only a single PDD (dated after the crediting period ended) was available, with no verification report, monitoring report, or identified verification body. The absence of documented additionality testing, verified ERR figures, and independent MRV data makes it impossible to confirm the integrity or accuracy of the claimed reductions.
Red Flags
- No verification body (VVB) is identified in any available document; additionality was never independently confirmed
- No verified ERR figure exists — the 34,702 tCO₂e claim rests solely on the PDD with no monitoring or verification report to corroborate it
- The PDD is dated 28 August 2024, i.e. after the crediting period ended on 31 December 2023, raising questions about whether this is a retroactive or reissued document
- Only one document (the PDD) was available for review; no verification report, monitoring report, or VVB audit trail was found
- Leakage deduction of 0% is justified only as 'deemed negligible' with no site-specific quantification or fuel-supply-chain analysis
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
Fuel-switch project, low inherent risk, but no buffer pool
0% deduction, 'deemed negligible' without quantified analysi
Project-specific baseline, no reassessment date stated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →