Renewable Biomass Based Thermal Energy Generation By SIIPL, Manjri, Pune, Maharashtra
#136of 196 in Biomass#143of 421 in Universal Carbon Registry (UCR)#30of 42 in AMS-I.C
Audit Analysis
A biomass thermal energy project under the UCR registry with a barrier-based additionality test and a project-specific baseline, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB documentation. The 43,814 tCO₂e claim over a four-year crediting period cannot be independently corroborated, and key integrity elements (VVB confirmation, buffer pool, verified ERR) are absent from the extracted record.
Red Flags
- No verification report, monitoring report, or VVB report found in the available documents — only a PDD is on file, making independent verification of the 43,814 tCO₂e claim impossible
- Additionality barrier test is identified in the PDD but no VVB name or verification confirmation is present in the record
- No buffer pool percentage or permanence mechanism is stated, leaving reversal risk unaddressed for the crediting period
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Barrier test in PDD, no VVB confirmation
No buffer pool stated; low reversal risk for thermal
0% deemed negligible; thin justification
Project-specific; no reassessment date
Mentioned; FPIC and grievance unconfirmed
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →