Skip to main content
UCRManjri Pune MaharashtraAMS-I.C

Renewable Biomass Based Thermal Energy Generation By SIIPL, Manjri, Pune, Maharashtra

UCR-279 ↗

#136of 196 in Biomass#143of 421 in Universal Carbon Registry (UCR)#30of 42 in AMS-I.C

3.6/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
4.5
Documentation
2.5

Audit Analysis

A biomass thermal energy project under the UCR registry with a barrier-based additionality test and a project-specific baseline, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB documentation. The 43,814 tCO₂e claim over a four-year crediting period cannot be independently corroborated, and key integrity elements (VVB confirmation, buffer pool, verified ERR) are absent from the extracted record.

Red Flags

  • No verification report, monitoring report, or VVB report found in the available documents — only a PDD is on file, making independent verification of the 43,814 tCO₂e claim impossible
  • Additionality barrier test is identified in the PDD but no VVB name or verification confirmation is present in the record
  • No buffer pool percentage or permanence mechanism is stated, leaving reversal risk unaddressed for the crediting period
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Barrier test in PDD, no VVB confirmation

Permanence

No buffer pool stated; low reversal risk for thermal

Leakage

0% deemed negligible; thin justification

Baseline

Project-specific; no reassessment date

Safeguards

Mentioned; FPIC and grievance unconfirmed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20AMS-I.C.: Thermal energy production with or without electricity

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents