Biomass based Cogeneration Project at Kashipur, Uttarakhand
#154of 196 in Biomass#224of 421 in Universal Carbon Registry (UCR)#33of 42 in AMS-I.C
Audit Analysis
This biomass cogeneration project under the UCR registry has a plausible structure (AMS-I.C methodology, 10-year crediting period, ~6,926 tCO₂e/yr) but the available record consists of a single PDD with no verification report, no monitoring report, and no identified VVB. Additionality is neither documented nor independently verified, no permanence mechanism is described, and key MRV parameters (FNRB, usage rates, grid emission factor) are absent from the extracted data.
Red Flags
- No additionality test type or VVB verification is documented in the available record; the PDD does not specify which test was applied or who confirmed it
- No buffer pool, permanence mechanism, or reversal-risk mitigation is described for a 10-year crediting period
- No verification report or monitoring report is present in the record; the verified ERR figure is not available
- FNRB method and value, usage monitoring method, and grid emission factor are all absent from the extracted data
- Only a single document (PDD dated 2023-01-07) is available, providing no independent verification of claimed emissions reductions
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found
No buffer pool or permanence mechanism documented
0% deemed negligible; reasonable but unquantified
Project-specific baseline; no reassessment date
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →