5 MW Marhi Small Hydro Electric Project in Kullu District of Himachal Pradesh
#7of 7 in Kullu Himachal Pradesh India#275of 421 in Universal Carbon Registry (UCR)#343of 417 in AMS-I.D
Audit Analysis
The 5 MW Marhi small hydro project under UCR presents a jurisdictional baseline and a smart-meter monitoring approach, but the available record consists solely of a Project Design Document with no verification report, monitoring report, or VVB assessment. The complete absence of additionality evidence, verified emission reduction figures, and any third-party verification makes it impossible to confirm the project's integrity or claim safety beyond the PDD's own assertions.
Red Flags
- No additionality test type or VVB verification of additionality is documented in the available record
- No verified or claimed emission reduction figures are available, preventing any assessment of over- or under-crediting
- Only a single document (PDD) is available; no verification report, monitoring report, or VVB report was found
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantitative analysis
- No buffer pool percentage is stated, leaving permanence risk unquantified
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool stated; hydro reversal risk low but unquantif
0% deduction, 'deemed negligible' justification only
Jurisdictional baseline, 2014 grid EF; no reassessment date
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →