51 MW Wind Power Project at Chitradurga
#473of 1935 in Renewable energy#244of 975 in India#244of 1339 in Verra (VCS)#355of 1287 in ACM0002
Audit Analysis
A 51 MW wind power project in India using the standard ACM0002 methodology, with VVB-confirmed additionality and no permanence risk. The project is under-delivering relative to its PDD estimate (55.5% of expected ER for the comparable period), which is conservative. However, significant documentation quality issues—including the verification report mislabeling the project as 'solar' in multiple sections and a long list of corrective actions—undermine confidence in the reporting chain.
Red Flags
- The joint validation and verification report incorrectly referred to the project as a 'solar project' in multiple sections, raising concerns about copy-paste errors and document control
- Twelve or more corrective actions were required, including inconsistencies between ER values in the monitoring report and the ER sheet, missing calibration certificates, and inconsistent monitoring parameters
- The project delivered only 55.5% of the PDD-estimated ER for the comparable period, attributed to low wind and machine downtime, suggesting the PDD overestimated output
- Baseline method is described as 'project' in the 2019 verification report but 'jurisdictional' in the 2024 monitoring report, creating ambiguity about the baseline approach
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 5,250 | 5,250 | 0 | |
| 2009 | 26,623 | 26,623 | 0 | |
| 2010 | 69,702 | 69,702 | 0 | |
| 2011 | 104,963 | 104,963 | 0 | |
| 2012 | 104,951 | 104,951 | 0 | |
| 2013 | 105,434 | 105,434 | 0 | |
| 2014 | 99,097 | 99,097 | 0 | |
| 2015 | 81,274 | 81,274 | 0 | |
| 2016 | 89,614 | 89,614 | 0 | |
| 2017 | 85,821 | 85,821 | 0 | |
| 2018 | 83,047 | 83,047 | 0 | |
| 2019 | 63,557 | 48,597 | 14,960 | |
| 2020 | 105,278 | 99,470 | 5,808 | |
| 2021 | 56,330 | 3,000 | 53,330 | |
| 2022 | 9,723 | 6,000 | 3,723 | |
| Total | 1,090,664 | 1,012,843 | 77,821 |
Risk Indicators
VVB-confirmed regulatory-surplus test
N/A – renewable energy, no reversal risk
0% deduction, deemed negligible for wind
Grid-EF baseline, method label inconsistent across docs
FPIC, grievance mechanism, benefit sharing documented
CORSIA-excluded, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →