Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredACM0002

51 MW Wind Power Project at Chitradurga

VCS-706 ↗

#473of 1935 in Renewable energy#244of 975 in India#244of 1339 in Verra (VCS)#355of 1287 in ACM0002

5.8/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A 51 MW wind power project in India using the standard ACM0002 methodology, with VVB-confirmed additionality and no permanence risk. The project is under-delivering relative to its PDD estimate (55.5% of expected ER for the comparable period), which is conservative. However, significant documentation quality issues—including the verification report mislabeling the project as 'solar' in multiple sections and a long list of corrective actions—undermine confidence in the reporting chain.

Red Flags

  • The joint validation and verification report incorrectly referred to the project as a 'solar project' in multiple sections, raising concerns about copy-paste errors and document control
  • Twelve or more corrective actions were required, including inconsistencies between ER values in the monitoring report and the ER sheet, missing calibration certificates, and inconsistent monitoring parameters
  • The project delivered only 55.5% of the PDD-estimated ER for the comparable period, attributed to low wind and machine downtime, suggesting the PDD overestimated output
  • Baseline method is described as 'project' in the 2019 verification report but 'jurisdictional' in the 2024 monitoring report, creating ambiguity about the baseline approach

Credit Vintages

IssuedRetiredAvailable
2008
5,2505,2500
2009
26,62326,6230
2010
69,70269,7020
2011
104,963104,9630
2012
104,951104,9510
2013
105,434105,4340
2014
99,09799,0970
2015
81,27481,2740
2016
89,61489,6140
2017
85,82185,8210
2018
83,04783,0470
2019
63,55748,59714,960
2020
105,27899,4705,808
2021
56,3303,00053,330
2022
9,7236,0003,723
Total1,090,6641,012,84377,821

Risk Indicators

Additionality

VVB-confirmed regulatory-surplus test

Permanence

N/A – renewable energy, no reversal risk

Leakage

0% deduction, deemed negligible for wind

Baseline

Grid-EF baseline, method label inconsistent across docs

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA-excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents