51 MW wind power project of ONGC at Surajbari, Gujarat in India
#191of 770 in Renewable energy#122of 387 in India#38of 213 in CDM (UNFCCC)#146of 383 in ACM0002
Audit Analysis
A 51 MW wind project in Gujarat with a jurisdictional baseline and VVB-confirmed investment additionality test, presenting a fundamentally sound design. However, the available record lacks a verified ERR figure, a stated monitoring period, and several MRV parameters, and the low extraction confidence on source documents limits assurance. Five material findings at validation were all resolved, but the overall evidentiary picture remains thin for a project in its mid-crediting period.
Red Flags
- No verified ERR figure or monitoring period is stated in the available documents, making it impossible to confirm delivery against the 90,540 tCO2e lifetime claim
- Low extraction confidence on at least one key document, reducing reliability of the extracted record
- Five material findings (CARs) at validation, including an incorrect methodology version (18.1 vs 19.0) and missing operational-lifetime evidence, though all were resolved
- Contradiction between the PDD (combined additionality test) and the validation report (investment test) on the same date
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 121,207 | 0 | 121,207 | |
| 2013 | 81,115 | 0 | 81,115 | |
| 2014 | 77,801 | 0 | 77,801 | |
| 2015 | 79,425 | 0 | 79,425 | |
| 2020 | 219,787 | 0 | 219,787 | |
| Total | 579,335 | 0 | 579,335 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional, reassessed 2019
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →