6 MW Biomass residue based cogeneration unit by MPML at Village Heti (Surla), District Nagpur in Maharashtra, India
#32of 196 in Biomass#151of 387 in India#52of 213 in CDM (UNFCCC)#9of 42 in AMS-I.C
Audit Analysis
A CDM biomass cogeneration project with VVB-confirmed additionality and a quantified leakage treatment, but with a project-specific baseline, no stated permanence mechanism, and several key monitoring data points (verified ERR, grid emission factor, usage rates) absent from the extracted record. Eight corrective actions were raised during validation and subsequently resolved, indicating initial documentation gaps that were remediated.
Red Flags
- Leakage due to biomass transportation and fossil fuel usage was not initially considered (CAR 7 in the validation report) and was only added after the VVB flagged it
- Total verified ERR is not stated in the extracted record, making it impossible to confirm the project actually delivered the claimed 107,984 tCO2e for the 2016–2018 monitoring period
- No buffer pool or permanence mechanism is documented, and no reversal events data is available
- Grid emission factor and FNRB values are not stated in any available document, limiting the ability to independently verify the baseline calculation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 30,607 | 0 | 30,607 | |
| 2012 | 36,068 | 0 | 36,068 | |
| 2013 | 105,237 | 0 | 105,237 | |
| 2014 | 59,367 | 0 | 59,367 | |
| 2015 | 75,067 | 0 | 75,067 | |
| 2017 | 46,606 | 0 | 46,606 | |
| 2018 | 34,602 | 0 | 34,602 | |
| 2022 | 107,983 | 0 | 107,983 | |
| Total | 495,537 | 0 | 495,537 |
Risk Indicators
VVB-confirmed combined test
No buffer pool or permanence mechanism stated
Quantified but percentage unstated; initially omitted
Project-specific; no reassessment date
Mentioned with benefit sharing; FPIC and grievance mechanism
CORSIA and CCP status not stated in any document
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →