7.5 MW biomass plants using agricultural waste Limited
#12of 196 in Biomass#67of 387 in India#18of 213 in CDM (UNFCCC)#36of 417 in AMS-I.D
Audit Analysis
A CDM biomass energy project in India with a solid VVB-confirmed additionality assessment (combined test by DNV) and a defensible 0% leakage deduction supported by surplus biomass studies. However, several key MRV parameters (FNRB, usage monitoring, verified ERR) are absent from the extracted record, and contradictions across documents on baseline method and additionality test type introduce moderate uncertainty. The project delivered roughly 81% of its pro-rata expected emissions reductions, indicating conservative crediting.
Red Flags
- Baseline method is contradictory: the validation report (2007) describes a jurisdictional baseline while the monitoring report (2011) describes a project-specific baseline, creating ambiguity about which approach was actually applied.
- No buffer pool percentage or permanence mechanism is stated in any available document, leaving reversal risk for the 10-year crediting period unaddressed.
- Verified ERR figure is not found in the extracted record, preventing independent confirmation of actual emissions reductions delivered.
- Grid emission factor of 0.85 tCO2/MWh is based on 2006 CEA data, which is now over 18 years old and may not reflect current grid conditions.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 190,303 | 0 | 190,303 | |
| Total | 190,303 | 0 | 190,303 |
Risk Indicators
Combined test, VVB-confirmed (DNV)
No buffer pool or permanence mechanism stated
0% deduction, quantified via surplus biomass studies
Method contradictory across documents; grid EF dated 2006
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →