Skip to main content
UCRMaharashtra IndiaAMS-I.D

7 MW Clean Energy project by Gro Solar

UCR-533 ↗

#1of 13 in Maharashtra India#52of 421 in Universal Carbon Registry (UCR)#194of 417 in AMS-I.D

4.0/ 10
Integrity
4.5
Transparency
2.5
Claim Safety
5.5
Documentation
2.5

Audit Analysis

A 7 MW grid-connected solar project in Maharashtra registered under the UCR standard with a jurisdictional baseline and a claimed lifetime emission reduction of approximately 122,600 tCO2 over ten years. The project's design parameters are broadly consistent with the technology and location, but the available record consists solely of a Project Design Document — no verification report, monitoring report, or VVB identification was found, leaving additionality, actual performance, and safeguards largely unverified.

Red Flags

  • No verification body (VVB) is identified in the available record; additionality test type and VVB confirmation are not stated
  • Only a single document (the PDD) is available; no verification or monitoring reports exist for the 2021–2025 monitoring period
  • No buffer pool or permanence-risk mitigation mechanism is documented
  • CORSIA eligibility and CCP approval status are not stated, leaving double-claiming risk unassessed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Methodology requires it but no test type or VVB confirmation

Permanence

No buffer pool documented; reversal risk unaddressed

Leakage

0 % deduction, reasonable for grid-displacement solar

Baseline

Jurisdictional baseline with 2023 grid EF; reassessment timi

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not docum

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents