Skip to main content
UCRAP MP and MaharashtraACM0002

77.2 MW Bundled Wind Projects in AP, MP and Maharashtra, India

UCR-320 ↗

#465of 770 in Renewable energy#27of 421 in Universal Carbon Registry (UCR)#325of 383 in ACM0002

4.2/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 77.2 MW bundled wind project registered under UCR using a CDM-era methodology (ACM0002 v20.0), with a jurisdictional baseline and no material findings. However, the available record consists solely of a PDD dated after the crediting period ended, with no verification reports, monitoring data, or VVB confirmation of additionality, leaving significant evidence gaps across all dimensions.

Red Flags

  • No verification report, monitoring report, or VVB report found in the extracted record — only a single PDD is available
  • Additionality test type and VVB confirmation are not stated in any available document
  • PDD is dated 19 April 2023, after the crediting period ended on 31 December 2022, raising questions about the registration timeline
  • No verified ERR figures available to confirm the 148,541 tCO2e lifetime claim

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB confirmation found

Permanence

Wind project; no carbon stock to reverse; no reversal events

Leakage

0% deduction deemed negligible; consistent with wind sector

Baseline

Jurisdictional baseline; last reassessment date not stated

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents