8 MW biomass based renewable energy generation for the grid, Gondia District, Maharashtra,India
#8of 196 in Biomass#37of 387 in India#10of 213 in CDM (UNFCCC)#20of 417 in AMS-I.D
Audit Analysis
A 2008-era CDM biomass power project (8 MW, Gondia, India) with a solid combined additionality test confirmed by DNV and a well-justified zero-leakage claim based on a 64% biomass surplus survey. The project is an avoidance-type renewable energy generation scheme with no inherent reversal risk, but the absence of a verified ERR figure for the monitoring period and a contradiction in the baseline method description between the validation and monitoring reports introduce moderate uncertainty. Overall a reasonably robust but somewhat dated CDM project with typical documentation gaps for its era.
Red Flags
- Baseline method is described as 'project-specific' in the monitoring report (2013) but 'jurisdictional' in the validation report (2008) — the two documents disagree on a fundamental methodological classification.
- Verified ERR for the monitoring period (2008–2011) is not available in the extracted record, preventing a pro-rata delivery check against the 282,681 tCO2e lifetime claim.
- Grid emission factor is from 2006 (814 gCO2/kWh); no updated or reassessed baseline value is found in the available documents.
- One of the four source documents is listed with an unknown type, reducing confidence in the completeness of the documentary record.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Quantified, 64% surplus justified
Project-specific, 2006 grid EF, method contradiction
Mentioned, benefit sharing present, FPIC/grievance not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →