9.8 MW Biomass Based Power Plant at Lahari Power & Steels Limited in Champa-Janjgir District, Chattisgarh
#5of 196 in Biomass#29of 387 in India#5of 213 in CDM (UNFCCC)#14of 417 in AMS-I.D
Audit Analysis
A 9.8 MW biomass power plant in Chhattisgarh, India, verified by DNV under CDM AMS I.D, with a solid combined additionality test (IRR below benchmark) and a jurisdictional grid-emission-factor baseline. The project delivered roughly half of its pro-rata ex-ante expectation in the first monitoring period, indicating conservative crediting. Key gaps include absent feedstock-sustainability documentation, no stated FN-RB or usage-rate data, and missing FPIC/grievance-mechanism records.
Red Flags
- Feedstock sustainability and carbon-content testing are not documented in any available record, leaving the biomass supply chain's environmental integrity unverified.
- FPIC and grievance mechanism are not documented despite safeguards being mentioned, creating a social-safeguards gap for a project operating in a rural Indian district.
- Grid emission factor is from 2006 with no documented baseline reassessment; while CDM rules differ from VCS, the age of the reference value warrants attention.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 42,464 | 0 | 42,464 | |
| Total | 42,464 | 0 | 42,464 |
Risk Indicators
VVB-confirmed combined test; IRR below benchmark
Energy-substitution project; no reversal risk or events
0% deduction with surplus-biomass justification
Jurisdictional grid EF from 2006; no reassessment documented
Safeguards mentioned but FPIC and grievance mechanism not do
CORSIA and CCP status not stated in available records
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →