African Biogas Carbon Programme (ABC) - Tanzania - CAMARTEC - VPA002
GS-1645 ↗ · current registry ID: GS2751
#91of 111 in Biogas#7of 8 in Tanzania#410of 426 in Gold Standard (GS)
Audit Analysis
The African Biogas Carbon Programme in Tanzania is a VVB-verified Gold Standard project with confirmed additionality and no reversal events, but it suffers from severe operational shortfalls: fewer than half the planned digesters were installed, the verified usage rate is roughly 60% of the ex-ante assumption, and the project was not actively operated during 2022. The VVB (TÜV NORD CERT) identified and required correction of numerous data inconsistencies, a double-counting error, and 18 outstanding corrective actions, while the CP2 renewal has been delayed by more than four years and a deviation request was rejected by Gold Standard.
Red Flags
- Verified usage rate of 59.62% is less than 60% of the 100% ex-ante assumption, indicating the original credit estimate was based on an unrealistically high utilisation rate
- Only 4,437 digesters were installed versus 9,928 in the ex-ante estimate — fewer than half the planned units
- The project was not actively implemented or operated during the 2022 monitoring period, creating a gap in continuity and permanence
- 21 digesters were removed from the database (12 for permanent non-operation, 7 destroyed/abandoned, 2 via VVB audit), signalling significant physical asset loss
- A double-counting error in the usage rate within the ER calculation was identified and corrected by the VVB, raising questions about the robustness of the MRV process
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 80,118 | 80,118 | 0 | |
| 2017 | 16,177 | 16,177 | 0 | |
| 2018 | 21,810 | 21,810 | 0 | |
| 2019 | 18,019 | 18,019 | 0 | |
| 2020 | 6,006 | 5,886 | 120 | |
| Total | 142,130 | 142,010 | 120 |
Risk Indicators
VVB-confirmed barrier test
No buffer pool; 21 units lost; 2022 operational gap
0% deduction, deemed negligible; earlier report said quantif
Project-specific measured baseline; reassessment date not st
FPIC done, grievance mechanism present but 1 case pending; G
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →