African Biogas Carbon Programme (ABC) - Tanzania - CAMARTEC - VPA002

GS-1645 ↗ · current registry ID: GS2751

#91of 111 in Biogas#7of 8 in Tanzania#410of 426 in Gold Standard (GS)

3.7/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
3.0
Documentation
4.0

Audit Analysis

The African Biogas Carbon Programme in Tanzania is a VVB-verified Gold Standard project with confirmed additionality and no reversal events, but it suffers from severe operational shortfalls: fewer than half the planned digesters were installed, the verified usage rate is roughly 60% of the ex-ante assumption, and the project was not actively operated during 2022. The VVB (TÜV NORD CERT) identified and required correction of numerous data inconsistencies, a double-counting error, and 18 outstanding corrective actions, while the CP2 renewal has been delayed by more than four years and a deviation request was rejected by Gold Standard.

Red Flags

  • Verified usage rate of 59.62% is less than 60% of the 100% ex-ante assumption, indicating the original credit estimate was based on an unrealistically high utilisation rate
  • Only 4,437 digesters were installed versus 9,928 in the ex-ante estimate — fewer than half the planned units
  • The project was not actively implemented or operated during the 2022 monitoring period, creating a gap in continuity and permanence
  • 21 digesters were removed from the database (12 for permanent non-operation, 7 destroyed/abandoned, 2 via VVB audit), signalling significant physical asset loss
  • A double-counting error in the usage rate within the ER calculation was identified and corrected by the VVB, raising questions about the robustness of the MRV process

Credit Vintages

IssuedRetiredAvailable
2014
80,11880,1180
2017
16,17716,1770
2018
21,81021,8100
2019
18,01918,0190
2020
6,0065,886120
Total142,130142,010120

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

No buffer pool; 21 units lost; 2022 operational gap

Leakage

0% deduction, deemed negligible; earlier report said quantif

Baseline

Project-specific measured baseline; reassessment date not st

Safeguards

FPIC done, grievance mechanism present but 1 case pending; G

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents