Skip to main content
GSEnergy Efficiency - DomesticMaliGeneral Methodologyv2.0

Bamako Clean Cookstoves - Improving livelihoods and fighting desertification in the Sahel zone

GS-874 ↗ · current registry ID: GS5003

#37of 202 in Industrial#114of 426 in Gold Standard (GS)

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

The Bamako Clean Cookstoves project has a solid additionality assessment (combined test confirmed by the VVB) and reasonable usage-rate conservatism, but suffers from notable gaps in permanence (no buffer pool, reversal events unaddressed) and leakage treatment (0% deduction with no justification in the latest verification report). Multiple contradictions across documents and a site-visit deviation due to security risks in Mali further erode confidence in the verification chain.

Red Flags

  • No buffer pool or reversal-risk mitigation identified in any available document for a project whose cookstoves have a finite operational life
  • Leakage deduction of 0% with justification described as 'not addressed' in the 2023 verification report, while the 2020 report indicated leakage was quantified — a regression in treatment
  • Site visit deviation: an Objective Observer conducted verification instead of the VVB due to security risks in Mali, weakening the independence of the verification
  • Crediting period end date is missing in the 2023 verification report (shown as open-ended), while the 2018 PDD listed an end date of 2022-04-30, creating uncertainty about the validity window
  • Ten contradictions identified across documents, including conflicting fNRB methods (national default vs. local field) and inconsistent leakage-justification descriptions

Credit Vintages

IssuedRetiredAvailable
2016
2022020
2017
33,82933,8290
2018
67,13762,5464,591
2019
75,31863,95911,359
2020
76,44861,44815,000
2021
86,15612,54073,616
2022
68,36868,3680
Total407,458302,892104,566

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No buffer pool, reversal unaddressed

Leakage

0% deduction, justification missing

Baseline

Project-specific, reassessed 2019

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents