Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalOman Registry: RegisteredACM0001

Al Multaqa Landfill Gas Recovery Project

VCS-4544 ↗

#27of 64 in Methane#379of 629 in Verra (VCS)#26of 53 in ACM0001

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

The Al Multaqa Landfill Gas Recovery Project in Oman is a registered VCS project with a reputable VVB (TÜV NORD CERT) and a VVB-verified combined additionality test, but it is undermined by a within-document grid emission factor contradiction (0.4 vs 1.3 in the same monitoring report), seven cross-document contradictions, and a verified emission reduction rate of only ~16% of the pro-rata lifetime expectation. The 0% leakage deduction is supported by inconsistent justifications across documents, and key permanence and safeguards data remain unconfirmed.

Red Flags

  • Grid emission factor contradiction within the same monitoring report (0.4 vs 1.3 tCO2/MWh) undermines confidence in the baseline calculation and MRV data quality
  • Verified ERR of 39,229 tCO2e is only ~16% of the pro-rata expectation (~242,099 tCO2e) derived from the PDD lifetime estimate of 1,210,493 tCO2e over 10 years, indicating significant under-delivery or an overly optimistic ex-ante estimate
  • Leakage deduction of 0% is justified as 'deemed negligible' in the monitoring report but 'not addressed' in the verification report, leaving the basis for the zero deduction unclear
  • FPIC status is contradictory: the verification report (Dec 2025) confirms it was conducted, while the monitoring report (Jul 2025) states it was not
  • Buffer pool percentage and reversal event history are not stated in any available document, leaving permanence risk unquantified

Credit Vintages

IssuedRetiredAvailable
2021
6,40406,404
2022
32,825032,825
2023
31,853031,853
2024
36,958036,958
Total108,0400108,040

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer pool and reversal history not stated

Leakage

0% deduction, inconsistent justification

Baseline

Project-specific; grid EF contradiction

Safeguards

FPIC and grievance status contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents