Asahan 1 Hydroelectric Power Plant 2 x 90 MW

CDM-4118 ↗

#407of 770 in Renewable energy#11of 17 in Indonesia#148of 213 in CDM (UNFCCC)#300of 383 in ACM0002

4.7/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

The Asahan 1 hydroelectric project (2 × 90 MW, CDM ACM0002) is a well-understood grid-displacement design with VVB-confirmed additionality and no inherent reversal risk. However, six corrective action requests, a contradiction in the baseline method description, an unresolved leakage justification discrepancy, and an internal inconsistency in the claimed ERR figures within the same monitoring report significantly undermine confidence in the data quality and documentation rigor.

Red Flags

  • Six corrective action requests (CARs) in the monitoring report cover missing calculation sheets, PDD inconsistencies, meter location gaps, and unaddressed backup-generator emissions — indicating material documentation deficiencies.
  • The monitoring report (2021) lists the claimed ERR as both 29,606 and 1,026,394 tCO₂e in the same document, an internal contradiction that cannot be reconciled without further clarification.
  • Leakage treatment is described as 'deemed negligible' in the 2018 validation report but 'not addressed' in the 2021 monitoring report, leaving the justification status ambiguous.
  • The stated monitoring period of only 9 days (2018-03-01 to 2018-03-09) is atypical for a 180 MW hydro plant and raises questions about the representativeness of the verified ERR of 1,021,075 tCO₂e.

Credit Vintages

IssuedRetiredAvailable
2015
1,137,75901,137,759
2017
2,798,24102,798,241
2021
4,058,41404,058,414
2022
1,665,53801,665,538
Total9,659,95209,659,952

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Hydro avoidance – no reversal risk

Leakage

0% deduction; justification contradictory across docs

Baseline

Grid-EF baseline; method label inconsistent across docs

Safeguards

Mentioned; FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents