AY-YILDIZ 15 MW WPP
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses the ACM0002 methodology with a project baseline.
missing The record contains contradictions on additionality, leakage, reversal status, and crediting period, and the latest validation report notes many corrective actions and clarifications.
Transparency
verified The monitoring period is stated for 2024, and the project has a named VVB and registry information.
missing Total verified versus claimed emission reductions are not stated in the extracted record, and the usage monitoring method is not found.
Claim Safety
verified Leakage is treated with a quantified deduction of 0%, and the project is marked CORSIA-eligible.
missing The baseline is project-specific rather than jurisdictional, and contradictions around leakage and additionality increase over-crediting risk.
Documentation
verified The file includes a substantial set of extracted documents and a recent validation report dated 2025-04-17.
missing Extraction confidence is low, the evidence-doc list is not informative, and the verification process involved many CARs and CLs before closure.
Detailed Analysis
Integrity
The latest validation report confirms additionality through an investment test and shows a quantified leakage deduction of 0%, which supports the project’s core accounting. At the same time, the record flags many corrective actions and clarifications, and the contradictions indicate that earlier documents described a different additionality test, different leakage treatment, and even a reported reversal status. I privileged the most recent validation report for the main values because it is the latest document, but the conflicting history still weakens confidence in the integrity assessment.
Transparency
The project has a named VVB, a stated monitoring period for 2024, and a recent validation date, which helps traceability. But the extracted record does not state total claimed or verified emission reductions, and the usage monitoring method is not found. The low extraction-confidence flag also suggests at least one key document was difficult to read, which limits transparency.
Claim Safety
Claim safety is helped by the quantified leakage deduction and the absence of reversal events in the latest validation report. However, the baseline is project-specific rather than a more conservative standardized or jurisdictional approach, and the contradictions on leakage and additionality create over-crediting risk. The project is marked CORSIA-eligible, which does not by itself reduce risk and keeps the claim channel open.
Documentation
Documentation is only moderate because the record includes many extracted facts and a recent validation report, but the evidence list is not informative and the extraction confidence is low. The verification process also generated numerous CARs and CLs, even though they were closed before issuance. The crediting period appears to have been updated in the latest validation report, but the contradictory earlier period shows the file history is not clean.
Overall
I privileged the latest validation report dated 2025-04-17 for the main scoring inputs because it is the most recent and specific source, but I discounted the score because the contradictions show material inconsistencies across the document set. In particular, the record conflicts on additionality test type, benefit sharing, leakage treatment, reversal status, safeguards, and crediting period, so reliability is weaker than the headline values suggest. The project is not a clear failure, but the evidence base is not strong enough for a high-confidence score.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality, a quantified leakage treatment, and no reversal events reported in the latest validation record. However, the file contains several contradictions across documents, a low extraction-confidence warning, and multiple corrective actions, which reduce confidence in the robustness of the claim set.
Project Description
Developer: AKENERJI ELEKTRIK URETIM AS Type: Wind Size: Small Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2009-09-01 → 2031-11-22 Estimated annual credits: 30997 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 6: Clean Water and Sanitation
Red Flags
- Several key items conflict across documents, including the additionality test type, leakage treatment, safeguards, reversal status, and crediting period.
- The verification record shows many corrective actions and clarifications, while public-facing evidence is thin and extraction confidence is low.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 8,139 | 8,139 | 0 | |
| 2010 | 26,635 | 26,025 | 610 | |
| 2011 | 29,957 | 29,957 | 0 | |
| 2012 | 28,522 | 28,418 | 104 | |
| 2013 | 19,481 | 19,481 | 0 | |
| 2014 | 8,171 | 8,170 | 1 | |
| 2015 | 27,112 | 26,912 | 200 | |
| 2016 | 19,174 | 15,679 | 3,495 | |
| Total | 167,191 | 162,781 | 4,410 |
Cosa migliorerebbe questo punteggio
- Provide a clean, reconciled document pack that resolves the contradictions on additionality, leakage, reversal status, safeguards, and crediting period.
- Publish the verified and claimed emission reduction totals, the usage monitoring method, and the full VVB evidence trail for the latest monitoring period.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but contradictory history
No reversals reported, buffer not stated
0% deduction with conflicting prior treatment
Project baseline, reassessment timing unclear
FPIC and grievance mechanism documented
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
Other
registry_page
validation
- Verification Report_monitoring period_01-03-2012 to 31-08-2013_v03.pdf
- GS.VER.22.27_FVR (GS634)_Clean.pdf
- (1)Verification Report_monitoring period_01-03-2012 to 31-08-2013_v02.pdf
- CCIPL 2443_GS634_RCP_FVR-CC.pdf
- Verification Report_1st monitoring period_11.04.2010 to 11.11.2010_v2.pdf
- Ay-Yıldız 15 MW_Revalidation_v4_CL.docx
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →