Skip to main content
GSBiogas - ElectricityThailandAMS-III.H

Bangna Starch Wastewater Treatment and Biogas Utilization Project (300084)

GS-999 ↗ · current registry ID: GS565

#87of 111 in Biogas#20of 22 in Thailand#397of 426 in Gold Standard (GS)#17of 22 in AMS-III.H

4.0/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
4.0

Audit Analysis

A Gold Standard biogas-to-electricity project in Thailand with VVB-verified additionality and a measured baseline, but undermined by ten corrective actions, a 0% leakage deduction with no justification in the most recent verification, a grid emission factor from 2006, and a verified ERR figure roughly 79 times the pro-rata expectation for the elapsed monitoring period. The combination of measurement non-conformities, an unregistered new boiler, and an FPIC contradiction across documents raises material concerns about the reliability of the claimed emissions reductions.

Red Flags

  • Ten corrective actions and three compliance log items raised in the 2022 verification report, including measurement procedures not aligned with the registered monitoring plan and flare efficiency assumed as zero due to incomplete logging
  • Verified ERR of 105,417 tCO2e for a two-month monitoring period versus a lifetime claimed estimate of 56,059 tCO2e over seven years — a pro-rata ratio of approximately 79×, indicating either an extremely conservative baseline or significant measurement uncertainty
  • New boiler installed in May 2020 for biogas utilization was not included in the project boundary; post-registration change not completed until expected March 2025
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2022 verification report, superseding the earlier 'deemed negligible' statement from 2018
  • Grid emission factor of 0.5637 tCO2/MWh is from 2006, more than 17 years before the monitoring period, raising questions about baseline currency

Credit Vintages

IssuedRetiredAvailable
2009
7870787
2010
25,582025,582
2011
33,061033,061
2012
41,598041,598
2013
47,581047,581
2014
41,510041,510
2015
46,015046,015
2016
53,248053,248
2020
41,92041,602318
2021
14,13914,1390
Total345,44155,741289,700

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal events

Leakage

0% deduction, justification not addressed (2022)

Baseline

Project-specific, measured, reassessed 2022; grid EF from 20

Safeguards

FPIC contradiction; grievance mechanism present

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-III.H

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents