Ege Wind Farm Project

GS-140 ↗ · current registry ID: GS1230

#51of 770 in Renewable energy#12of 121 in Turkey#17of 426 in Gold Standard (GS)#16of 417 in AMS-I.D

6.5/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
6.5
Documentation
5.5

Audit Analysis

The Ege Wind Farm is a well-structured Gold Standard wind project with strong VVB-confirmed additionality (IRR 6% vs 15% benchmark) and inherently low permanence and leakage risk. However, a baseline-method inconsistency across verification reports (project-specific vs jurisdictional), a significant grid emission factor shift (0.4929 to 0.6488), and low extraction confidence in the source documents temper confidence in the overall data quality. All corrective actions were closed before verification, and the 9.4% over-delivery sits within the 10% sensitivity band.

Red Flags

  • Baseline method is described as 'project-specific' in the 2025 verification report but 'jurisdictional' in the 2020 verification report — the more recent document is privileged, but the inconsistency undermines baseline confidence
  • Grid emission factor changed from 0.4929 (2021 document) to 0.6488 (2020 reference year used in 2025 monitoring), a 32% increase that materially affects the magnitude of claimed reductions
  • Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted data
  • Five Corrective Action Requests during verification included an incorrect electricity generation calculation (months after June 2019 omitted) and insufficient EPIAS data precision

Credit Vintages

IssuedRetiredAvailable
2015
3,7403,7400
2016
18,31314,9673,346
2017
16,29211,6964,596
2018
15,20515,2050
2019
16,40512,1014,304
2020
15,49330915,184
2021
16,558016,558
2022
12,708012,708
Total114,71458,01856,696

Risk Indicators

Additionality

VVB-confirmed investment test, IRR 6% vs 15% benchmark

Permanence

Wind avoidance project, no reversal risk identified

Leakage

0% deduction, justified as negligible for grid-displacing wi

Baseline

Method inconsistent across reports (project vs jurisdictiona

Safeguards

FPIC conducted, grievance mechanism in place, safeguards doc

Double-claim

CORSIA not stated, CCP not mentioned — dual-channel risk unc

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents