Baotou Iron & Steel Coke Dry Quenching and Waste Heat Utilization for Electricity Generation Project
#66of 202 in Industrial#99of 204 in China#74of 213 in CDM (UNFCCC)#7of 17 in ACM0004
Audit Analysis
A CDM-era coke dry quenching waste-heat electricity project in China with VVB-confirmed additionality and a standard methodology, but undermined by a 0% leakage deduction whose justification is described as 'not addressed' in the most recent monitoring report, a project-specific baseline, and an extensive list of 29 corrective actions raised during validation. The absence of a verified ERR figure and several key MRV parameters limits confidence in the credit volume.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the 2016 monitoring report, contradicting the 2013 report's 'deemed negligible' language
- 29 corrective actions were required during validation, including revisions to the IRR analysis, grid emission factor data, project emissions calculation, and boiler efficiency assumption
- Total verified ERR is not found in any available document, preventing independent confirmation of the 341,539 tCO2e lifetime claim
- Grid emission factor of 0.9826 tCO2/MWh is drawn from 2006 data, which may not reflect current grid conditions in the Baotou region
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 113,303 | 0 | 113,303 | |
| 2011 | 261,715 | 0 | 261,715 | |
| 2012 | 109,417 | 0 | 109,417 | |
| 2013 | 114,064 | 0 | 114,064 | |
| 2017 | 341,539 | 0 | 341,539 | |
| Total | 940,038 | 0 | 940,038 |
Risk Indicators
VVB-confirmed combined test
Avoidance-type EE, no reversal risk
0% deduction, justification 'not addressed'
Project-specific, 2006 grid EF
Mentioned, FPIC/grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →