Skip to main content
UCRVisakhapatnamAMS-II.I

Bio-CNG Project in Visakhapatnam

UCR-239 ↗

#369of 421 in Universal Carbon Registry (UCR)#18of 23 in AMS-II.I

2.8/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
3.5
Documentation
2.0

Audit Analysis

The Bio-CNG project in Visakhapatnam is documented solely by a project design document (PDD) with no verification report, monitoring report, or VVB record available. Critical elements including additionality assessment, leakage treatment, and verified emissions reductions are absent from the extracted record, making it impossible to confirm the integrity of the 145,229 claimed emissions reductions over the 2019–2021 crediting period.

Red Flags

  • No verification body identified and no verification or monitoring report present in the available documentation — the 145,229 claimed ERR figure is entirely unverified
  • Leakage explicitly not addressed for a Bio-CNG project where displaced fuel combustion is a plausible leakage pathway
  • No additionality test type or VVB confirmation found in any available document
  • No buffer pool or permanence risk mitigation documented for the project

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality assessment found in available documents

Permanence

No buffer pool; no reversal events but no verification data

Leakage

Explicitly not addressed for a Bio-CNG project

Baseline

Project-specific baseline; no reassessment date stated

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not docum

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-III.AQ., AMS III.AO.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents