Bio-CNG Project in Thane
#420of 421 in Universal Carbon Registry (UCR)#23of 23 in AMS-II.I
Audit Analysis
The Bio-CNG project in Thane is registered under UCR with a claimed 133,114 credits over a ~3.7-year crediting period, but the available evidence is limited to a single PDD from 2018. No verification report, monitoring report, or VVB assessment is present, leaving additionality, permanence, leakage, and MRV quality entirely unverified. The project-specific baseline and explicitly unaddressed leakage represent material integrity concerns for a methane-recovery project.
Red Flags
- Leakage is explicitly marked as 'not addressed' in the PDD, which is a significant gap for a Bio-CNG / anaerobic digestion project where methane slip is a well-known emission pathway
- No verification report or VVB assessment is available; additionality testing, baseline validation, and MRV compliance cannot be confirmed
- No buffer pool or permanence risk mechanism is documented, leaving reversal risk unquantified
- Only one document (the PDD) is in the evidence base; no monitoring report exists to verify the 133,114 claimed credits
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool or reversal data; risk unquantified
Explicitly not addressed in a methane-recovery project
Project-specific baseline; no reassessment data
Mentioned and benefit-sharing described; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →