Biomass Based Cogeneration Project by CG GROUP, NEPAL

VCS-1624 ↗

#79of 196 in Biomass#12of 14 in Nepal#505of 629 in Verra (VCS)

4.5/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A biomass cogeneration project under VCS AMS-I.C. with a confirmed investment-test additionality assessment and inherently low reversal risk, but significant data gaps in monitoring, verified emissions, and baseline parameters. Four contradictions between the 2016 PDD and the 2023 validation report (grievance mechanism, benefit sharing, leakage treatment, safeguards) were resolved in favour of the more recent validation report, though the leakage discrepancy warrants caution. The absence of any verified monitoring data and the low extraction confidence limit confidence in the project's actual performance.

Red Flags

  • No verified monitoring data available — total ERR verified is not stated in any document, making it impossible to confirm actual delivery against the 472,940 tCO2e lifetime claim
  • Leakage treatment is contradictory: the 2023 validation report states leakage was 'quantified' while the 2016 PDD states it was 'deemed negligible' — the actual deduction percentage is not stated in either document
  • Free, Prior and Informed Consent (FPIC) was not conducted, which is a safeguard gap for a project operating in Nepal
  • Grid emission factor is not stated in any available document, leaving the baseline displacement assumption unverifiable
  • Low extraction confidence across the document set indicates at least one key document was poorly readable, reducing reliability of the extracted record

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

Non-AFOLU; inherently low reversal risk

Leakage

Quantified per validation but no % stated; PDD says negligib

Baseline

Project-specific; grid EF not stated; reassessment not yet d

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents