Biomass based Renewable Energy Generation at Karnal
#67of 196 in Biomass#263of 387 in India#431of 629 in Verra (VCS)#20of 42 in AMS-I.C
Audit Analysis
A biomass energy-generation project in Karnal, India, with VVB-confirmed additionality and a recently reassessed project-specific baseline, but significant gaps in permanence documentation (no stated buffer pool, reversal events unaddressed), a major FPIC contradiction between the verification and monitoring reports, and a low extraction confidence that undermines overall data reliability. The project delivered roughly 24% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating under-performance rather than over-crediting, but the original PDD estimate appears optimistic.
Red Flags
- FPIC contradiction: the 2025 verification report states FPIC was not conducted, while the 2025 monitoring report states it was — a fundamental safeguard discrepancy that cannot be resolved without primary evidence
- Buffer pool percentage is not stated in any available document and reversal events are explicitly marked as not addressed, leaving permanence risk unquantified
- Nine contradictions across documents (FPIC, additionality test type, ERR figures, grievance mechanism, benefit sharing, leakage justification, safeguards, crediting period, verified ERR) indicate significant internal inconsistency in the project record
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing confidence in all extracted values
- Feedstock sustainability, carbon content testing, LCA, and usage monitoring method are all absent from the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 5,068 | 0 | 5,068 | |
| 2013 | 40,858 | 0 | 40,858 | |
| 2014 | 14,931 | 0 | 14,931 | |
| Total | 60,857 | 0 | 60,857 |
Risk Indicators
VVB-confirmed barrier test
Buffer pool unstated; reversals unaddressed
Deemed negligible; reasonable for grid displacement
Project-specific; reassessed 2024
Grievance present; FPIC contradiction unresolved
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →