Vai al contenuto principale
VCS avoidance India Registry: Late to verify Documentazione completa General Methodology v2.0

Bundled Biomass Based Thermal Energy Projects In U.P. & Punjab Of Sukhbir Agro Energy Limited

VCS-261 ↗

5.6 / 10
Integrity
6.4
Transparency
4.8
Claim Safety
5.2
Documentation
5.6

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB in the validation report, which supports the project’s core eligibility case.

missing Leakage treatment is weakly evidenced: the documents only say leakage is deemed negligible, with no quantified deduction found.

Transparency

verified The validation report identifies the VVB as TÜV NORD CERT GmbH and the project uses VCS methodology AMS-I.C. version 13.

missing Key monitoring and issuance fields are missing, including the monitoring period, verified ERs, claimed ERs, and usage-monitoring method.

Claim Safety

verified The project is an avoidance activity with a project baseline, which is generally less exposed to reversal risk than removal projects.

missing The contradiction on additionality weakens claim safety: the PDD refers to a barrier test, while the validation report supports an investment test.

Documentation

verified The record includes at least two core document types, and the validation report is dated 2009-11-13 with a defined crediting period.

missing Extraction confidence is only medium, and one document is listed as unknown, suggesting incomplete document coverage.

Detailed Analysis

Integrity

The validation report from TÜV NORD CERT GmbH confirms additionality through an investment test, which is a meaningful positive signal. However, leakage is only described as negligible and no quantified deduction is available, and the baseline is project-specific with no reassessment date found. No material findings or corrective actions were reported in the validation report, which helps, but the missing permanence and leakage detail keep the score moderate.

Transparency

Transparency is constrained by missing MRV and registry details in the extracted record. The project and methodology are identified, but the monitoring period, verified and claimed ER totals, and usage-monitoring method were not found. The absence of these core reporting fields makes it difficult to independently assess issuance quality.

Claim Safety

Claim safety is mixed because the project is an avoidance activity under VCS, but the evidence base is incomplete. The PDD and validation report disagree on the additionality test type: the PDD indicates a barrier test, while the validation report supports an investment test; I privileged the validation report because it is the later and independent VVB assessment. Leakage is not quantified, and CORSIA or CCP status is not stated, so over-claim risk remains elevated.

Documentation

Documentation quality is moderate rather than strong. The extracted record includes the PDD and validation report, but one source is listed as unknown and extraction confidence is only medium. The crediting period is stated, yet the monitoring period and issuance figures are missing, which suggests incomplete documentation coverage for a full quality review.

Overall

The main contradiction is on additionality: the PDD cites a barrier test, while the validation report cites an investment test. I privileged the validation report because it is the independent VVB document and appears later than the PDD, but the discrepancy still reduces reliability. Overall, the project looks plausible but not especially transparent, with missing MRV data and unquantified leakage limiting confidence.

Audit Analysis

The project has some positive integrity signals, including VVB-verified additionality, FPIC, and a grievance mechanism, but key MRV and crediting details are missing from the extracted record. The baseline is project-specific rather than clearly standardized, leakage is only described as negligible without a quantified deduction, and registry/usage information is incomplete, which limits confidence in the claims.

Project Description

This bundled biomass-based heat generation project involves the installation of two rice husk-fired boilers by M/s Sukhbir Agro Energy Ltd and M/s Sri Ram Solvex. With an annual estimated rice husk requirement of 17,068.78 and 4,874.42 tons respectively, the project will provide vital steam to support the manufacturing of rice and rice bran oil.

Red Flags

  • Leakage was described as negligible, but no quantified leakage deduction was found in the available documents.
  • Monitoring-period, usage-monitoring, and verified issuance figures were not found in the extracted record, limiting transparency.

Credit Vintages Exhausted

Issued Retired Available
2007
2,760 2,760 0
2008
26,440 26,440 0
2009
26,285 26,285 0
Total 55,485 55,485 0

Cosa migliorerebbe questo punteggio

  • Provide the monitoring report with verified and claimed emission reductions, monitoring period, and usage-monitoring method.
  • Disclose quantified leakage treatment, buffer or reversal provisions if applicable, and clarify the additionality test discrepancy between the PDD and validation report.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

avoidance project, buffer not stated

Leakage

negligible claimed, not quantified

Baseline

project baseline, reassessment missing

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-15 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti