Biomass Briquette Based Earth Stove Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined additionality test.
missing Baseline reassessment timing, buffer pool coverage, and reversal handling are not stated in available documents.
Transparency
verified A monitoring report is available for the 2009-07-01 to 2012-03-31 period, and the report includes quantified leakage treatment.
missing The VVB name and verified versus claimed emission reduction totals are not stated in the extracted record.
Claim Safety
verified Leakage is quantified in the monitoring report with a 10% deduction, which is safer than an unqualified zero deduction.
missing The project is marked CORSIA-eligible, while CCP status is not stated, leaving some dual-claim uncertainty.
Documentation
verified Two official document types were used, and the monitoring report is dated 2013-09-13, which is reasonably close to the crediting period.
missing Extraction confidence is only medium, and several important fields are not found in the available documents.
Detailed Analysis
Integrity
The monitoring report states that additionality was confirmed by the VVB and that a combined additionality test was used, which supports the project’s core integrity case. On the other hand, baseline reassessment is not stated, buffer pool coverage is not found, and reversal events are marked as not addressed, so permanence and baseline robustness are only partly evidenced. The quantified leakage deduction of 10% is a positive sign, but the contradiction with the PDD’s zero or negligible leakage treatment weakens confidence in the underlying assumptions.
Transparency
Transparency is moderate because the extracted record includes a monitoring report with a defined monitoring period and quantified leakage treatment. However, the VVB name is not stated, and the verified versus claimed emission reduction totals are not available in the extracted record, limiting auditability. The absence of a clearly stated FNRB method and verified usage rate also leaves important MRV elements incomplete.
Claim Safety
Claim safety is mixed. The later monitoring report’s 10% leakage deduction is more conservative than the PDD’s earlier negligible or zero leakage position, so I privileged the monitoring report because it is more recent and reflects monitored performance. Still, the project is marked CORSIA-eligible and CCP status is not stated, which leaves some residual dual-claim and market-claim uncertainty.
Documentation
Documentation quality is fair but not strong. Only the PDD and monitoring report are listed as evidence documents, and the extraction confidence is medium rather than high. The monitoring report is dated 2013-09-13, but several key items such as the VVB name, buffer pool, baseline reassessment, and verified usage rate are not found in the available documents.
Overall
Overall, I privileged the monitoring report over the PDD where contradictions exist because it is later and reflects monitored project data, especially for leakage and the crediting period. Specifically, I relied on the monitoring report’s 10% leakage deduction instead of the PDD’s zero or negligible leakage treatment, and on the monitoring report’s crediting period rather than the earlier PDD range. These contradictions indicate some reliability issues, so the score is held below what the positive additionality finding alone might suggest.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality, a quantified leakage deduction, and no material findings reported in the monitoring report. However, permanence and baseline robustness are only partially documented, and the record contains contradictions on leakage treatment and the crediting period that reduce confidence. Transparency is moderate because the monitoring report is available, but key verification details such as the VVB name and verified error reduction figures are not stated in the extracted record.
Project Description
Developer: Climate Impact Partners Limited Type: Biomass, or Liquid Biofuel - Heat Size: Micro scale Methodology: Other Crediting period: 2009-07-01 → 2016-06-30 Estimated annual credits: 2997 tCO2e SDGs: Goal 12: Responsible Production and Consumption, Goal 13: Climate Action
Red Flags
- The monitoring report and PDD disagree on leakage treatment, with the later report using a 10% deduction while the PDD described leakage as negligible or zero.
- The crediting period differs across documents, which creates uncertainty about which issuance window should be relied on.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 162 | 162 | 0 | |
| 2010 | 317 | 317 | 0 | |
| 2011 | 333 | 333 | 0 | |
| 2012 | 89 | 89 | 0 | |
| Total | 901 | 901 | 0 |
Cosa migliorerebbe questo punteggio
- Provide the full verification statement with the VVB name, verified emission reductions, and any corrective action history.
- Clarify the baseline, leakage, and crediting-period treatment in a reconciled document that explains why the monitoring report supersedes the PDD.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
No reversal treatment stated
10% deduction with prior contradiction
Project baseline, reassessment missing
FPIC and grievance mechanism present
CORSIA-eligible, CCP status unstated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →