Skip to main content
GSBiomass, or Liquid Biofuel - ElectricityIndiaGeneral Methodologyv2.0

Biomass in Rajasthan - Electricity generation from mustard crop residues

GS-240 ↗ · current registry ID: GS1689

#49of 196 in Biomass#209of 387 in India#206of 426 in Gold Standard (GS)

5.2/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A CDM biomass electricity project in Rajasthan with a confirmed investment-test additionality and jurisdictional baseline, but undermined by an extensive list of data-quality findings in the monitoring report, a grid emission factor frozen at 2002 values, and a monitoring-period credit volume nearly seven times the pro-rata expectation from the PDD. The project lacks a buffer pool, free-prior-informed-consent documentation, and any stated CORSIA or CCP status, leaving meaningful gaps in permanence and market-integrity safeguards.

Red Flags

  • Monitoring-period ERR of 38,681 tCO2 is approximately 697% of the pro-rata expectation (5,552 tCO2/yr) derived from the PDD lifetime estimate of 55,524 tCO2 over 10 years, driven by a plant load factor of 91.42% versus the 75% assumed in the PDD.
  • Grid emission factor of 718 gCO2/kWh is anchored to 2002 data while the monitoring period covers 2012–2013, a 10-year gap that inflates the calculated emission reductions.
  • 28 material findings and 24 corrective actions were raised by the VVB, including incorrect emission-reduction calculations (auxiliary power not deducted), missing monthly breakdowns, and inconsistent biomass consumption data.
  • No buffer pool percentage is stated in any available document, leaving no quantified permanence safeguard for the issued credits.
  • Free, prior and informed consent (FPIC) is not documented in the extracted record, and the grievance mechanism, while present, is not described in detail.

Credit Vintages

IssuedRetiredAvailable
2012
35,603035,603
2013
19,835019,835
Total55,438055,438

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

No buffer pool stated; no reversal events but no quantified

Leakage

0% deduction with VVB-quantified justification

Baseline

Jurisdictional baseline but grid EF frozen at 2002; PLF assu

Safeguards

Grievance mechanism and benefit sharing present; FPIC not do

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents