Biomass in Rajasthan - Electricity generation from mustard crop residues
GS-240 ↗ · current registry ID: GS1689
#49of 196 in Biomass#209of 387 in India#206of 426 in Gold Standard (GS)
Audit Analysis
A CDM biomass electricity project in Rajasthan with a confirmed investment-test additionality and jurisdictional baseline, but undermined by an extensive list of data-quality findings in the monitoring report, a grid emission factor frozen at 2002 values, and a monitoring-period credit volume nearly seven times the pro-rata expectation from the PDD. The project lacks a buffer pool, free-prior-informed-consent documentation, and any stated CORSIA or CCP status, leaving meaningful gaps in permanence and market-integrity safeguards.
Red Flags
- Monitoring-period ERR of 38,681 tCO2 is approximately 697% of the pro-rata expectation (5,552 tCO2/yr) derived from the PDD lifetime estimate of 55,524 tCO2 over 10 years, driven by a plant load factor of 91.42% versus the 75% assumed in the PDD.
- Grid emission factor of 718 gCO2/kWh is anchored to 2002 data while the monitoring period covers 2012–2013, a 10-year gap that inflates the calculated emission reductions.
- 28 material findings and 24 corrective actions were raised by the VVB, including incorrect emission-reduction calculations (auxiliary power not deducted), missing monthly breakdowns, and inconsistent biomass consumption data.
- No buffer pool percentage is stated in any available document, leaving no quantified permanence safeguard for the issued credits.
- Free, prior and informed consent (FPIC) is not documented in the extracted record, and the grievance mechanism, while present, is not described in detail.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 35,603 | 0 | 35,603 | |
| 2013 | 19,835 | 0 | 19,835 | |
| Total | 55,438 | 0 | 55,438 |
Risk Indicators
Investment test confirmed by VVB
No buffer pool stated; no reversal events but no quantified
0% deduction with VVB-quantified justification
Jurisdictional baseline but grid EF frozen at 2002; PLF assu
Grievance mechanism and benefit sharing present; FPIC not do
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →