BOG and COG Utilisation for Combined Cycle Power CDM Project in Jinan Iron & Steel Works
#178of 204 in China#188of 213 in CDM (UNFCCC)#7of 15 in ACM0012
Audit Analysis
A CDM energy-efficiency power generation project in China with a barrier additionality test and project-specific baseline, but significant data gaps including no verified emissions reductions, no monitoring period, and a seven-fold discrepancy between the PDD and validation report on total expected credits. The 0% leakage deduction rests on a thin 'deemed negligible' justification, and no buffer pool or permanence safeguards are documented.
Red Flags
- Seven-fold discrepancy in total expected emissions reductions: the PDD (Oct 2013) states 11,135,894 tCO2e while the validation report (Nov 2013) states 1,590,842 tCO2e — a 7× gap that raises serious questions about the reliability of the project's credit estimates
- No verified emissions reductions or monitoring period data found in any available document, making it impossible to confirm actual delivery against claims
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, which is weak for a power-generation project where displaced electricity could be generated by higher-emission sources
- No buffer pool or permanence safeguard documented, leaving credits exposed to reversal if the combined-cycle plant is decommissioned or repurposed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 712,832 | 0 | 712,832 | |
| 2008 | 1,315,905 | 0 | 1,315,905 | |
| 2009 | 1,204,361 | 0 | 1,204,361 | |
| 2010 | 394,024 | 0 | 394,024 | |
| 2011 | 1,476,292 | 0 | 1,476,292 | |
| 2012 | 2,395,680 | 0 | 2,395,680 | |
| 2013 | 281,503 | 0 | 281,503 | |
| 2014 | 776,640 | 0 | 776,640 | |
| Total | 8,557,237 | 0 | 8,557,237 |
Risk Indicators
Barrier test present; VVB confirmation not explicitly stated
No buffer pool; no reversal data; asset-decommissionment ris
0% deduction; 'deemed negligible' without quantified analysi
Project-specific baseline; reassessed 2013 at validation
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.