Bugoye 13.0 MW Run-of-River Hydropower Project

VCS-1199 ↗

5.5 / 10
Integrity
5.8
Transparency
5.1
Claim Safety
5.0
Documentation
6.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test in the validation report.

missing Leakage is not addressed in the monitoring report, and the project is a grid-connected hydropower activity where leakage should be explicitly discussed.

Transparency

verified The project has multiple official documents in the record, including validation, monitoring, PDD, and issuance materials.

missing The monitoring report requested clarification on meter calibration, hourly shutdown details, and the single-line diagram, indicating gaps in MRV completeness.

Claim Safety

verified The project is marked as not CORSIA-eligible, which reduces one channel of dual-claim risk.

missing The verified and claimed emissions reductions are 281,345, but earlier validation material cited 51,177, creating a material inconsistency in the credited volume.

Documentation

verified The extraction confidence is high and 17 documents were used, which supports a reasonably strong documentary base.

missing The monitoring report still contains unresolved clarification requests, and the crediting period differs from the earlier PDD period, showing document evolution and some inconsistency.

Detailed Analysis

Integrity

The validation report confirms additionality through an investment test, which is stronger than the barrier test mentioned in the PDD, so I privileged the validation report because it is the later and more specific VVB-checked source. No material findings were reported, but leakage is not addressed in the monitoring report, and the project is a run-of-river hydropower activity where baseline and leakage treatment should be clearly documented. The absence of a buffer pool value and any reversal evidence leaves permanence only moderately supported.

Transparency

The record includes a validation report, monitoring report, PDD, and issuance material, which helps transparency, and the VVB is named as LGAI Technological Center, S.A. (Applus+ Certification). However, the monitoring report requested clarification on meter calibration, hourly shutdown details, and the single-line diagram, which suggests incomplete MRV disclosure. The total emissions reductions verified and claimed are both 281,345 in the later validation record, but the supporting detail behind that figure is not fully transparent in the extracted record.

Claim Safety

Claim safety is weakened by the large discrepancy between the earlier 51,177 figure and the later 281,345 verified and claimed amount; I privileged the 2021 validation report because it is the more recent verification source, but the jump still raises over-crediting concerns. The project is not CORSIA-eligible, which helps, but CCP status is not stated. Leakage treatment is inconsistent across documents, with the earlier validation calling it negligible and the monitoring report saying it was not addressed.

Documentation

Documentation is fairly broad, with 17 documents used and high extraction confidence, which supports a mid-range score. Still, the monitoring report contains explicit requests for clarification on project naming, meter calibration, and shutdown data, showing that the documentary record is not fully clean. The later monitoring period also differs from the earlier PDD crediting period, which is not inherently problematic but does show that the project record evolved over time.

Overall

I privileged the later validation and monitoring documents over the earlier PDD where they conflict, because they are more recent and closer to issuance, but the contradictions still reduce confidence. In particular, the additionality test type changed from barrier in the PDD to investment in validation, the credited emissions reductions changed from 51,177 to 281,345, leakage moved from negligible to not addressed, and the crediting period differs between documents. These discrepancies do not invalidate the project outright, but they justify a conservative mid-range overall score.

Audit Analysis

This is a registered VCS run-of-river hydropower project with VVB-confirmed additionality and no material findings reported, which supports moderate integrity. However, leakage is not addressed in the monitoring report, meter calibration and shutdown details were requested for clarification, and there are several document-level contradictions that reduce confidence in the claims.

Project Description

Proponent: Bugoye Hydro Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 51074 tCO2e Region: Africa Registration date: 2020-04-06

Red Flags

  • The monitoring report says leakage was not addressed, while an earlier validation report treated leakage as negligible.
  • The verification record shows a large jump in verified and claimed emissions reductions from 51,177 to 281,345, which needs careful explanation.
  • The monitoring report requested clarification on meter calibration and missing hourly shutdown and single-line diagram details.
  • FPIC was not conducted, and the grievance mechanism and safeguards appear inconsistently documented across reports.

Credit Vintages

Issued Retired Available
2009
51,177 51,156 21
2013
42,153 42,153 0
2014
54,128 48,074 6,054
2015
47,984 20,741 27,243
2016
41,006 0 41,006
2017
19,996 19,996 0
2018
48,423 48,423 0
2019
27,655 27,581 74
Total 332,522 258,124 74,398

Cosa migliorerebbe questo punteggio

  • Provide a clear reconciliation of the 51,177 versus 281,345 emissions reduction figures, with a traceable explanation from the underlying monitoring and verification records.
  • Publish complete MRV evidence for meter calibration, shutdown logs, and the single-line diagram, and explicitly document leakage treatment and any buffer or reversal safeguards.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal evidence, but buffer not stated

Leakage

Leakage not addressed in monitoring

Baseline

Project baseline, reassessment not stated

Safeguards

Partial safeguards with no FPIC

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-15 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti