Bundle of 100 village biomass gasifier based power plants totalling 5.15 MW for Decentralised Energy Systems India Pvt. Ltd. in Bihar

CDM-1187 ↗

#121of 307 in Biomass#517of 699 in India#1037of 1514 in CDM (UNFCCC)#5of 6 in AMS-I.A

4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A 2007 CDM project bundling 100 small biomass gasifier plants in Bihar with a combined additionality test confirmed by DNV, but the available record is limited to a single validation report with no monitoring data, no verified emissions reductions, and several key sustainability parameters (feedstock, FNRB, buffer pool) unaddressed. The project is structurally sound on additionality but suffers from significant evidence gaps that prevent a confident assessment of actual delivery.

Red Flags

  • No monitoring reports or verified emissions reduction figures found in the available record — the 431,960 tCO2e claimed figure cannot be independently corroborated
  • Feedstock sustainability and carbon content testing are not stated in any available document, a material gap for a biomass energy project
  • Only a 2007 validation report is available; no subsequent monitoring, verification, or baseline reassessment documents were found
  • Leakage deduction of 0% is justified only as 'deemed negligible' without a quantified analysis in the extracted record

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test confirmed by DNV

Permanence

No buffer pool or reversal data found

Leakage

0% deduction, thin justification

Baseline

Project-specific, no reassessment data

Safeguards

Mentioned but FPIC and grievance mechanism unstated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-I.A

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents