CAMLICA II HEPP

GS-108 ↗

4.8 / 10
Integrity
5.2
Transparency
4.6
Claim Safety
4.4
Documentation
5.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test in the validation report, which supports the project case.

missing Leakage treatment is inconsistent: the verification report says it was not addressed, while the monitoring report later calls it negligible; reversal risk is also not clearly addressed.

Transparency

verified The project has a named VVB, a defined 2023 monitoring period, and Gold Standard registry identification.

missing Verified and claimed emission reduction totals are not stated in the extracted record, and the documentation shows a large number of corrective and clarification requests.

Claim Safety

verified The baseline was reassessed in 2022, which is better than an unrevised legacy baseline.

missing The project is marked CORSIA-eligible, but CCP status is not mentioned and leakage justification is inconsistent, increasing over-crediting and dual-claim risk.

Documentation

verified Multiple official documents were available, including the PDD, validation report, verification report, and monitoring report.

missing One extracted source is poorly identified as an unknown document, and the record contains contradictions on leakage, benefit sharing, additionality framing, and the crediting period.

Detailed Analysis

Integrity

The validation report confirms additionality through an investment test, which is a meaningful positive. On the other hand, the verification report says leakage was not addressed, while the monitoring report later describes it as negligible, so I privilege the more recent monitoring statement for operational practice but still discount the score because the inconsistency weakens reliability. Reversal risk is also not clearly treated, with no buffer pool information found and reversal events not clearly addressed in the extracted record.

Transparency

The project has a named verifier, Re Carbon Ltd., and a clear 2023 monitoring period, which supports basic traceability. However, the extracted record does not state the verified or claimed emission reduction totals, and the number of corrective and clarification requests in the verification report suggests the MRV package required substantial cleanup. The documentation is therefore usable but not especially transparent.

Claim Safety

The baseline was last reassessed in 2022, which is a positive sign, but the baseline method remains project-based rather than a more standardized approach. Claim safety is weakened by the leakage inconsistency and by the fact that the project is marked CORSIA-eligible while CCP status is not mentioned, leaving some dual-claim uncertainty. I also note that the verification report predates the monitoring period, so I rely more on the later monitoring report for current operational details, but not enough to offset the overall risk.

Documentation

The record draws on several official documents, including the PDD, validation report, verification report, and monitoring report, and extraction confidence is high. Still, the file set includes an unknown document and multiple contradictions, especially on leakage, benefit sharing, additionality framing, and the crediting period. The large number of corrective and clarification requests in verification also indicates that the documentation was not clean or fully settled at first pass.

Overall

Overall, this is a mid-quality file with some solid project-level evidence but several reliability issues. I privilege the more recent monitoring report for leakage treatment and the validation report for additionality, because they are either newer or more directly tied to the relevant claim, but the contradictions still reduce confidence. The score is held down by unclear leakage treatment, incomplete reversal treatment, and the absence of clear verified issuance figures in the extracted record.

Audit Analysis

The project has some positive signals, including VVB-confirmed additionality and documented FPIC and grievance mechanisms. However, key risk controls are weak or unclear: leakage is not consistently justified across documents, reversal treatment is not clearly addressed, and the record contains several contradictions that reduce confidence in the claims.

Project Description

Developer: GTE KARBON SUSTAINABLE ENERJI EGITIM DANISMANLIK VE TICARET A.S. Type: Small, Low - Impact Hydro Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2015-01-01 → 2028-12-31 Estimated annual credits: 44145 tCO2e SDGs: Goal 15: Life On Land, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 12: Responsible Production and Consumption, Goal 6: Clean Water and Sanitation, Goal 9: Industry, Innovation and Infrastructure

Red Flags

  • Leakage is described as not addressed in the verification report, while a later monitoring report says it is negligible.
  • The crediting period and additionality approach differ across documents, and the record shows many corrective and clarification requests during verification.

Credit Vintages

Issued Retired Available
2015
45,718 45,718 0
2016
31,614 31,614 0
2017
10,286 10,251 35
2018
12,608 12,608 0
2019
36,002 19,141 16,861
2020
36,485 729 35,756
2021
17,081 341 16,740
2022
16,205 0 16,205
2023
14,358 0 14,358
Total 220,357 120,402 99,955

Cosa migliorerebbe questo punteggio

  • Publish a consistent, document-backed explanation for leakage and reversal treatment across the verification and monitoring records.
  • Provide the verified and claimed emission reduction totals, plus a clear statement on CCP status and any dual-claim restrictions.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversal treatment unclear

Leakage

inconsistent leakage treatment

Baseline

project baseline with reassessment

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti