Canakkale WPP
Score Breakdown
Integrity
verified The validation report confirms additionality through an investment test and says the VVB accepted it.
missing Leakage is not addressed in the validation record, buffer pool coverage is not stated, and reversal status is not clearly documented.
Transparency
verified The project has a named VVB, a defined monitoring period, and a recent validation report dated 2025-04-21.
missing No verified emission reduction totals, no usage monitoring method, and no FNRB method are stated in the extracted record.
Claim Safety
verified The project uses ACM0002 under Gold Standard and shows a baseline reassessment in 2025, which helps with baseline currency.
missing The file shows a 0% leakage deduction without a supporting explanation, and CORSIA eligibility is true while CCP status is not mentioned.
Documentation
verified The record includes many extracted facts, a named verifier, and multiple validation/verification findings that were closed out.
missing Extraction confidence is low, the evidence document list is effectively incomplete, and several corrective actions remain documented in the file set.
Detailed Analysis
Integrity
The project has a positive integrity signal because the validation report says additionality was confirmed through an investment test by RINA. However, leakage is marked as not addressed in the extracted validation record, buffer pool coverage is not stated, and reversal events are also not clearly documented, which weakens permanence and leakage confidence. The presence of many corrective actions and a stakeholder noise complaint adds some operational risk, even though the reported findings were closed out.
Transparency
Transparency is mixed. The record identifies the verifier, the monitoring period from 2020-03-28 to 2023-02-28, and a recent validation report dated 2025-04-21, but it does not state verified ERR totals, a usage monitoring method, or an FNRB method. The low extraction confidence further reduces confidence that the documentation is complete.
Claim Safety
Claim safety is moderate rather than strong. The project uses a standard wind methodology and has a 2025 baseline reassessment, but the extracted record shows a 0% leakage deduction without a supporting justification and no verified usage-rate evidence. CORSIA eligibility is stated as true, while CCP status is not mentioned, so dual-claim risk is not fully resolved.
Documentation
Documentation quality is limited by the low extraction confidence and the fact that the evidence document list is not informative. The file set does include many validation and verification findings, but it also shows numerous corrective actions and at least one forward action request, indicating that the documentation was not clean or fully settled. The crediting period is recent, but the contradictions and missing quantified fields reduce confidence in completeness.
Overall
I privileged the 2025 validation report for the most recent statements, but I also noted contradictions against earlier documents on additionality test type, benefit sharing, leakage treatment, reversal status, and crediting period. Where the newer record conflicts with older ones, I gave more weight to the later validation report because it is more recent and likely reflects the current project status, but the existence of these discrepancies still lowers reliability. Because documentation is weak and several key items are missing or inconsistent, the project scores as middling rather than high-confidence.
Audit Analysis
This is a wind project with a VVB-confirmed investment test and a recent validation report, but the documentation shows several reliability gaps and unresolved issues. The biggest concerns are the lack of a clear leakage explanation, no stated buffer pool, and multiple corrective actions and clarification requests, including a stakeholder noise complaint. Overall, the project looks moderately credible but not especially robust on documentation or claim safety.
Project Description
Developer: Enerjisa Enerji Uretim A.S. Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2011-02-11 → 2025-02-10 Estimated annual credits: 54377 tCO2e SDGs: Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth
Red Flags
- Leakage is not addressed in the extracted validation record, even though a 0% deduction is shown.
- The record contains several contradictions on additionality, benefit sharing, leakage treatment, reversal status, and crediting period, which weakens confidence in the file set.
- No verified usage monitoring, no ERR totals, and no FNRB method are stated in the extracted documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 45,114 | 45,114 | 0 | |
| 2012 | 51,316 | 51,316 | 0 | |
| 2013 | 47,543 | 47,302 | 241 | |
| 2014 | 42,918 | 42,894 | 24 | |
| 2015 | 49,983 | 49,983 | 0 | |
| 2016 | 50,159 | 50,059 | 100 | |
| 2017 | 46,787 | 46,787 | 0 | |
| 2018 | 6,157 | 6,000 | 157 | |
| 2020 | 37,578 | 0 | 37,578 | |
| 2021 | 48,627 | 0 | 48,627 | |
| 2022 | 51,116 | 0 | 51,116 | |
| 2023 | 3,868 | 0 | 3,868 | |
| Total | 481,166 | 339,455 | 141,711 |
Cosa migliorerebbe questo punteggio
- Provide a clear leakage assessment with supporting justification and reconcile the 0% deduction with the methodology requirements.
- Publish verified ERR totals, usage monitoring details, and a complete, readable evidence pack that resolves the documented contradictions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No buffer pool stated
0% deduction, weak justification
Project baseline, reassessed in 2025
FPIC and grievance mechanism present
CORSIA-eligible, CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Monitoring Report_5th monitoring period_01-04-2016 to 10-02-2018_v4(1).doc
- Monitoring Report_2nd monitoring period_01.09.2012 to 30.09.2013_v2.pdf
- Annual Report 2021_Çanakkale_WPP.pdf
- GS906 Emission Reductions Calculations.xls
- Canakkale-WPP-Annual-Report.pdf
- Final_MR_654 Canakkale Wind_v8_05.07.2024.pdf
- +9 more
pdd
validation
- Verification Report_2nd monitoring period_01.09.2012 to 30.09.2013_v1.1.pdf
- GS906 Validation Report_05.06.2012_rev9.pdf
- Verification Report_4th monitoring period_01.04.2015 to 31.03.2016_v2.pdf
- FVR_GS_RCP REPORT_2025TQMD24_Çanakkale WPP_Rev 2.0Aa_21042025.pdf
- Verification Report_3rd monitoring period_01.10.2013 to 31.03.2015_v1.pdf
- Verification Report_5th monitoring period_01-04-2016 to 10-02-2018_v3(1).pdf
- +1 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →