Cataloluk HEPP

GS-1237 ↗

4.1 / 10
Integrity
4.2
Transparency
4.8
Claim Safety
4.0
Documentation
3.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the monitoring record states no extreme-event reversals were reported.

missing The monitoring report lists numerous corrective and clarification requests, and the reversal treatment is not addressed consistently across documents.

Transparency

verified The project has a named verifier, a defined monitoring period, and a verified emissions total of 36,774 tCO2e.

missing Key MRV details are missing or not stated, including the usage monitoring method, buffer pool percentage, and FNRB method.

Claim Safety

verified The record shows a leakage deduction of 0% with leakage described as negligible, and the project is marked CORSIA-eligible.

missing The baseline is project-specific rather than standardized, and contradictions around leakage and crediting period weaken confidence in the claimed volume.

Documentation

verified The file includes a substantial number of extracted facts and a recent monitoring report dated 2025-09-02.

missing Extraction confidence is low, evidence documents are not clearly identified, and the report contains many unresolved corrective actions.

Detailed Analysis

Integrity

The verification record supports additionality through an investment test and the VVB confirms it, which is a positive sign. The monitoring report also states no extreme-event reversal occurred, but reversal treatment is not consistently addressed elsewhere and the file contains many corrective and clarification requests, which weakens confidence in project integrity.

Transparency

Transparency is mixed because the project has a named verifier, a defined monitoring period, and a verified total of 36,774 credits, but several core MRV fields are missing. The usage monitoring method, buffer pool percentage, and FNRB method are not stated in available documents, which limits independent assessment of the monitoring quality.

Claim Safety

Claim safety is moderate at best. The project shows a 0% leakage deduction with leakage described as negligible, but the baseline is project-specific rather than a more robust standardized approach, and the contradictions around leakage treatment and crediting period reduce confidence in the claimed issuance volume.

Documentation

Documentation quality is weak because the extraction confidence is low and the evidence documents are not clearly identified in the record. The monitoring report dated 2025-09-02 is recent, but it also lists many corrective actions and clarifications, indicating incomplete or problematic documentation.

Overall

I privileged the more recent monitoring report for operational details, but I treated contradictions conservatively because they indicate reliability issues. For additionality, I gave more weight to the VVB-confirmed investment test than the older combined-test reference; for leakage and reversal treatment, I discounted confidence because the record conflicts on whether leakage was quantified and whether reversals were reported. The overall score is held down by low extraction confidence, missing MRV specifics, and the large number of corrective actions, even though the project has some positive integrity signals.

Audit Analysis

The project has some positive signals, including VVB-confirmed additionality, a stated leakage deduction of 0%, and no reversal events reported in the monitoring record. However, the file shows many corrective actions, low extraction confidence, missing key MRV details, and several contradictions that reduce confidence in the reported claims.

Project Description

Developer: ST Climate Type: Small, Low - Impact Hydro Size: Small Scale Crediting period: 2010-04-01 → 2031-03-31 Estimated annual credits: 17467 tCO2e SDGs: Goal 9: Industry, Innovation and Infrastructure, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action

Red Flags

  • The monitoring report records many corrective and clarification requests, including multiple CARs and FARs, which suggests material documentation or implementation issues.
  • Several key items are inconsistent across documents, including additionality approach, benefit sharing, leakage treatment, reversal treatment, and crediting period.

Credit Vintages

Issued Retired Available
2010
8,012 8,012 0
2011
16,955 16,716 239
2012
17,398 17,398 0
2013
15,917 15,917 0
2014
7,232 7,232 0
2015
17,430 17,430 0
2022
446 0 446
2023
10,754 0 10,754
2024
5,111 0 5,111
Total 99,255 82,705 16,550

Cosa migliorerebbe questo punteggio

  • Publish a complete, reconciled MRV package that resolves the contradictions on additionality, leakage, reversal treatment, benefit sharing, and crediting period.
  • Provide the missing monitoring details, including usage monitoring methodology, buffer pool treatment, and any jurisdictional or standardized baseline reassessment evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversals reported, but buffer not stated

Leakage

0% deduction with conflicting treatment

Baseline

Project baseline, reassessment timing limited

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible; CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti