Chuanwei Group 24 MW Waste Gas Based Captive Power Plant
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification report reports no material findings or corrective actions.
missing Leakage treatment is weakly supported: the later record says leakage is not addressed, and no buffer pool or reversal management details were found.
Transparency
verified The project has a named verifier and a defined monitoring period, which helps traceability.
missing Key MRV details are missing or unclear, including the usage monitoring method, and the emissions totals differ materially between documents.
Claim Safety
verified The project is marked as not CORSIA-eligible, which reduces dual-market claim risk.
missing The baseline is project-specific rather than clearly standardized or recently reassessed, and the emissions quantity contradiction raises over-crediting concerns.
Documentation
verified Multiple official documents were used, and the extraction confidence is medium rather than low.
missing Important safeguards and implementation details are incomplete, including no grievance mechanism, no FPIC evidence, and no clear leakage justification in the later record.
Detailed Analysis
Integrity
The verification report confirms additionality through a barrier test and states that no material findings or corrective actions were required, which is a positive sign. At the same time, the baseline is described only as project-based, leakage is marked as not addressed in the later record, and there is no buffer pool or reversal information in the extracted facts, so permanence and leakage robustness are only moderate.
Transparency
The project has a named VVB and a clearly stated monitoring period, which supports basic auditability. However, the usage monitoring method is not found in the available documents, and the emissions totals differ sharply between the older and later records, which weakens transparency and makes the reported results harder to verify.
Claim Safety
Claim safety is constrained by the project-specific baseline and the unresolved emissions discrepancy. The later record shows the project as not CORSIA-eligible, which helps reduce dual-claim risk, but the contradiction between 237,205 and 925,415 tCO2e materially affects confidence in the claimed volume of reductions.
Documentation
Documentation is only moderate because multiple documents were used and the extraction confidence is medium, but several core items remain missing or incomplete. Safeguards are mentioned, yet no grievance mechanism or FPIC evidence is found, and the later record does not provide a clear leakage justification, reducing completeness.
Overall
I privileged the later-dated records where they appear to reflect the final consolidated verification package, but I reduced confidence because the record contains material contradictions on credited emissions, additionality test type, leakage justification, safeguards, and crediting period. The later values were used because they are more recent and appear to be the higher-level summary, but the presence of older conflicting figures means the data reliability is only moderate. Under the scoring rules, the project avoids a severe integrity penalty because additionality was VVB-confirmed and no material findings were reported, but the unresolved contradictions and missing MRV details keep the overall score in the mid range.
Audit Analysis
This is a registered VCS avoidance project with VVB-confirmed additionality and no material findings reported, which supports moderate integrity. However, several key items are weakly documented or contradictory, including the baseline approach, leakage treatment, safeguards, and credited emissions figures, which lowers confidence in the claimed climate benefit.
Project Description
The Chuanwei Group 24 MW waste gas based captive power plant in Sichuan Province, China utilizes waste gas to generate electricity, reducing greenhouse gas emissions and supplying carbon-free electricity. The installation of two sets of 12 MW condensing turbine generators not only contributes to sustainable development, but also creates local job opportunities.
Red Flags
- The credited emissions figures conflict across documents, with an older record showing 237,205 tCO2e and a later record showing 925,415 tCO2e.
- Leakage is not clearly addressed in the later record, and the project has no buffer pool information or reversal evidence in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 136,692 | 136,692 | 0 | |
| 2008 | 100,513 | 100,513 | 0 | |
| 2011 | 49,747 | 49,747 | 0 | |
| 2012 | 198,338 | 198,338 | 0 | |
| 2013 | 192,056 | 150,865 | 41,191 | |
| 2014 | 188,503 | 147,628 | 40,875 | |
| 2015 | 192,630 | 104,182 | 88,448 | |
| 2016 | 104,141 | 93,141 | 11,000 | |
| Total | 1,162,620 | 981,106 | 181,514 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled emissions statement explaining the difference between the older and later credited totals, with document hierarchy and calculation traceability.
- Publish complete MRV and safeguards evidence, including leakage treatment, usage monitoring method, grievance mechanism, and any buffer or reversal management provisions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed barrier test
No reversal evidence or buffer details
Leakage not clearly addressed
Project baseline, reassessment unclear
Safeguards mentioned but incomplete
Not CORSIA-eligible; CCP status unstated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →