Climate Resilient & Community Driven Mangrove Afforestation Programme
#50of 66 in Soil carbon#7of 7 in Sri Lanka#571of 629 in Verra (VCS)
Audit Analysis
This VCS mangrove afforestation project in Sri Lanka (1,031 ha, AR-AM0014 v3.0) carries a 20-year crediting period and an 11% buffer pool, but its integrity is undermined by 19 corrective action requests during validation that flagged fundamental non-compliance of the baseline and additionality with the VCS Combined Tool, alongside seven cross-document contradictions. No monitoring reports or verified ERR figures are available, and the low extraction confidence on key documents further limits confidence in the project's data quality.
Red Flags
- 19 Corrective Action Requests raised during validation, including that the baseline scenario and additionality demonstration were not in full compliance with the VCS Combined Tool (v01)
- Seven contradictions between the 2025 validation report (all positive) and the 2023 issuance / 2022 PDD (all negative or unaddressed) on FPIC, additionality, grievance mechanism, benefit sharing, safeguards, leakage, and reversal events
- No monitoring reports or verified ERR figures found in any available document; total_err_verified is absent from the record
- One Forward Action Request remains open regarding verification of the contractual agreement for the entire project longevity
- Low extraction confidence on at least one key document, reducing reliability of the extracted data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but CARs flagged Combined Tool non-compliance
11% buffer, no reversals, 10% risk rating
0% deemed negligible; SOC pool concerns flagged in CARs
Project-specific; CARs note Combined Tool non-compliance
FPIC and grievance per 2025 validation; contradicted by 2023
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →