Skip to main content
ScoredCCEnergy industriesArmeniaRegistry: Issuance requestedACM0002

Construction of 11 Solar Power Plants (SPPs) in Armenia

Developer: Eastern Energy Solutions d.o.o

ECO-179 ↗

#416of 4033 in Renewable energy#7of 165 in CerCarbono (CC)#266of 2743 in ACM0002

Assessment

CarbonMeld document-based assessment

01020304 Overall 6.5 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

A 11-plant solar PV project in Armenia under the CerCarbono standard with a VVB-verified combined additionality test, jurisdictional baseline, and conservative under-delivery relative to pro-rata expectations. The project is well-structured but carries moderate documentation gaps (FNRB method, usage monitoring, CORSIA status not stated) and several inter-document contradictions that were resolved through corrective actions. CCP approval introduces a modest dual-channel risk.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    Mentioned in the project documents

    The documents mention CCP eligibility; no registry label confirms it.

    Source: project documents (not confirmed by the registry)

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

No issuances recorded on the registry.

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →