Rated
Karapınar YEKA Solar Power Plant Project
- Standard
- CC
- Methodology
- ACM0002 (CDM)
- Registry
- ECO-126 ↗ · Registered
- Country
- Turkey
- Credit type
- Energy industries, Energy industries
- Developer
- Kalyon Güneş Enerjisi Üretim A.Ş
CarbonMeld's document-based rating gives Karapınar YEKA Solar Power Plant Project (ECO-126) 3.1 out of 10 (Very low rating) under CarbonMeld methodology v3, documents read on 9 Nov 2026. The analysis read 19 of the 19 registry documents. It is CarbonMeld's own assessment, not a rating given by the registry or the standard.
Assessment
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 5,882 | 0 | 5,882 | |
| 2021 | 421,355 | 0 | 421,355 | |
| 2022 | 1,101,564 | 0 | 1,101,564 | |
| 2023 | 1,426,564 | 0 | 1,426,564 | |
| Total | 2,955,365 | 0 | 2,955,365 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2020–2023ACM0002the documents for this period state different versions (v21.0, v21.0.1)
verification report + issuance document
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Cite this page
CarbonMeld (2026). Karapınar YEKA Solar Power Plant Project (ECO-126): CarbonMeld document-based rating, methodology v3, documents read on 9 Nov 2026. https://carbonmeld.com/projects/karap-nar-yeka-solar-power-plant-project/.
The citation names the rating by its methodology version and the day the documents were read.
Similar projects
Same methodology or sector, the same registry first.
- Expansion San Pedro Wind Farm ProjectECO-240
- Proyecto hidroeléctrico Porce IIIECO-16
- Construction of 11 Solar Power Plants (SPPs) in ArmeniaECO-179
- San Pedro Wind Farm ProjectECO-239
- Proyecto Hidroeléctrico AlejandríaECO-88
- Proyecto Hidroeléctrico Dario Valencia SamperECO-39
- Guajira I Wind FarmECO-196
- Bosques Solares de los Llanos 1ECO-109
